First Edition • Third Printing
Operator's Manual Supplement
Operating Instructions
Part No. 1288240GT
Lift Tools
™
Material Carrier
15
Operating Instructions
Material Carrier Operation
1
Verify the material carrier assembly and
installation instructions have been followed
properly; ensure the material carriers are in
contact with the platform floor and secured to
the platform railings.
2
Place the load so that it rests in both material
carriers. The length of the load should be
parallel with the platform.
3
Center the load in the material carrier.
Tip-over hazard. The center of
the load must be within the
perimeter of the main deck of
the platform.
4
Secure the load to each material carrier. Pass
the nylon strap over the load. Connect the
hook to the material carrier. Tighten the
ratchet strap.
5
Gently push and pull on the load to make sure
the material carriers and load are secure.
6
Keep the load secured when the machine is in
motion.
Tip-over hazard. If the load on
the material carrier extends
beyond the perimeter of the
platform, ensure that it does not
strike objects outside the
platform while raising or lowering
the platform.
Tip-over hazard. The weight of
the material carrier assembly
and the load in the material
carrier will reduce the platform
capacity of the machine and
must be factored into the total
platform load.
Tip-over hazard. The weight of
the material carrier assembly
and the load in the material
carrier may limit the maximum
number of occupants in the
platform.
Component damage hazard. Do
not use the machine to place
loads into position.
Содержание Genie Lift Tools GS-2669
Страница 17: ......