Operator's Manual Supplement
First Edition • Third Printing
Installation Instructions
12
Lift Tools
™
Material Carrier
Part No. 1288240GT
Deck Extended
1
material carrier
2
U-bolt and nylock flange nut
3
swing gate
4
main deck
5
extension deck
Страница 1: ...Material Carrier GS 2669 from GS6914 3662 from GS6914 5000 from GS69F 10500 GS 3369 from GS84 40000 from GS90 40001 GS 3384 GS 3390 GS 4069 GS 4390 GS 5390 ANSI CSA Models Original Instructions First...
Страница 2: ...us Contact Us Internet www genielift com E mail awp techpub terex com Approved Model Models From Serial Number GS 2669 BE GS 3369 BE GS 4069 BE GS6914 5000 GS 2669 DC GS 3369 DC GS 4069 DC GS6914 3662...
Страница 3: ...provided with the material carrier Do not exceed the rated platform capacity The weight of the material carrier assembly will reduce the rated platform capacity and must be subtracted from the total...
Страница 4: ...e sure that all decals are legible and in place Inspect the work area for obstructions that could inhibit safe loading and unloading of the Material Carrier Check the Material Carrier for damage impro...
Страница 5: ...or s manual Be sure that all necessary tools and parts are available and ready for use Read this procedure completely and adhere to the instructions Attempting shortcuts may produce hazardous conditio...
Страница 6: ...t in the machine tipping over causing death or serious injury 1 Mount the rail attachments to the platform using U bolts and nylock flange nuts Hand tighten Genie part number 1288658GT 131681GT 127432...
Страница 7: ...Printing Operator s Manual Supplement Installation Instructions Part No 1288240GT Lift Tools Material Carrier 7 Deck Retracted 1 material carrier 2 U bolt and nylock flange nut 3 swing gate 4 main de...
Страница 8: ...upplement First Edition Third Printing Installation Instructions 8 Lift Tools Material Carrier Part No 1288240GT Deck Extended 1 material carrier 2 U bolt and nylock flange nut 3 swing gate 4 main dec...
Страница 9: ...First Edition Third Printing Operator s Manual Supplement Installation Instructions Part No 1288240GT Lift Tools Material Carrier 9 Optional Location Deck retracted...
Страница 10: ...Deck Extended Note Ensure the location of the Material Carrier with load does not interfere with entering or exiting through the platform gate Tip over hazard Do not install more than one set of mater...
Страница 11: ...Printing Operator s Manual Supplement Installation Instructions Part No 1288240GT Lift Tools Material Carrier 11 Deck Retracted 1 material carrier 2 U bolt and nylock flange nut 3 swing gate 4 main de...
Страница 12: ...upplement First Edition Third Printing Installation Instructions 12 Lift Tools Material Carrier Part No 1288240GT Deck Extended 1 material carrier 2 U bolt and nylock flange nut 3 swing gate 4 main de...
Страница 13: ...First Edition Third Printing Operator s Manual Supplement Installation Instructions Part No 1288240GT Lift Tools Material Carrier 13 Optional Location Deck retracted...
Страница 14: ...Lift Tools Material Carrier Part No 1288240GT Optional Locations Deck Extended Tip over hazard Do not install more than one set of material carriers in the platform The illustration represents the two...
Страница 15: ...l carrier Pass the nylon strap over the load Connect the hook to the material carrier Tighten the ratchet strap 5 Gently push and pull on the load to make sure the material carriers and load are secur...
Страница 16: ...w Maximum Occupancy GS 2669 700 lbs 317 kg 140 x 7 2 GS 3369 500 lbs 227 kg 140 x 7 2 GS 4069 350 lbs 159 kg 140 x 7 1 GS 3384 700 lbs 317 kg 310 x 7 3 GS 3390 700 lbs 317 kg 310 x 7 3 GS 4390 700 lbs...
Страница 17: ......