Terex AL5000 Скачать руководство пользователя страница 36

D

is

tr

ib

u

te

d

 B

y:

Genie North America

Phone 

425.881.1800

Toll Free 

USA and Canada
800.536.1800

Fax 

425.883.3475

Genie Australia Pty Ltd.

Phone  +

61 7 3375 1660

Fax  +

61 7 3375 1002

Genie China

Phone  +

86 21 53852570

Fax  +

86 21 53852569

Genie Malaysia

Phone  +

65 98 480 775

Fax  +

65 67 533 544

Genie Japan

Phone  +

81 3 3453 6082

Fax  +

81 3 3453 6083

Genie Korea

Phone  +

82 25

 

587

 

267

Fax  +

82 25

 

583

 

910

Genie Brasil

Phone  +

55 11 41 665 755

Fax  +

55 11 41 665 754

Genie Holland

Phone  +

31 183 581 102

Fax  +

31 183 581 566

Genie Scandinavia

Phone  +

46 31 575100

Fax  +

46 31 579020

Genie France

Phone  +

33 (0)2 37 26 09 99

Fax  +

33 (0)2 37 26 09 98

Genie Iberica

Phone  +

34 93 579 5042

Fax  +

34 93 579 5059

Genie Germany

Phone  +

49 (0)4202 88520

Fax  +

49 (0)4202 8852-20

Genie U.K.

Phone  +

44 (0)1476 584333

Fax  +

44 (0)1476 584334

Genie Mexico City

Phone +

52 55 5666 5242

Fax  +

52 55 5666 3241

Before Driving

On The Road

Before Towing

· Boom hold-down latch is securely locked in place
· Towing hitch is properly secured to tow vehicle
· Safety chains (if required) are properly attached 

and secure (chains are crossed below hitch)

· All lights are connected and working
· Tires are properly inflated

· Fasten safety restraints
· Properly adjust mirrors

· Do not exceed 60 mph / 97 km/h. Obey all local 

and national towing speed laws

· Check connections and tire pressure at each stop
· Slow down for hazardous conditions
· Allow extra distance for following and passing other 

vehicles

Towing Checklist

(Use at each stop)

California Proposition 65

Warning

The exhaust from this product 

contains chemicals known to 

the State of California to 

cause cancer, birth defects 

or other reproductive harm.

Содержание AL5000

Страница 1: ......

Страница 2: ...have any questions call Terex Contents Page Introduction 1 General Safety AL4000 3 General Safety AL5000 5 Work Area Safety 7 Legend AL4000 10 Controls AL4000 11 Legend AL5000 13 Controls AL5000 14 E...

Страница 3: ...read understand and obey employer s safety rules and worksite regulations You read understand and obey all applicable governmentalregulations You are properly trained to safely operate the machine Ow...

Страница 4: ...safety sign material Hazard Classification Terex uses symbols color coding and signal words to identify the following Safety alert symbol used to alert personneltopotentialpersonal injury hazards Obe...

Страница 5: ...PartNo 116416 AL4000 AL5000 3 Operator s Manual First Edition First Printing General Safety AL4000 Safety signs and locations...

Страница 6: ...Operator s Manual First Edition First Printing 4 AL4000 AL5000 PartNo 116416 General Safety AL4000 Safety signs and locations...

Страница 7: ...PartNo 116416 AL4000 AL5000 5 Operator s Manual First Edition First Printing General Safety AL5000 Safety signs and locations...

Страница 8: ...Operator s Manual First Edition First Printing 6 AL4000 AL5000 PartNo 116416 Safety signs and locations General Safety AL5000...

Страница 9: ...he lamps with the engine generator running This machine should be grounded in accordance with all local electrical codes Consult the local electrical codes or Authority Having Jurisdiction in the area...

Страница 10: ...breathe exhaust fumes Do not work on this equipment when mentally or physically fatigued Do not work on this equipment when under the influence of drugs or alcohol Do not use the machine if the protec...

Страница 11: ...s machine Do not tow the machine unless the tower is lowered to the horizontal position and the travel lock is secured Do not overload your tow vehicle Check the manufacturer s Gross Vehicle Weight Ra...

Страница 12: ...3 inch section 3 Tower 4 inch section 4 Coil cord sleeve 5 Leveling jack 6 Fender 7 Tire 8 Ballasts located inside cabinet 9 Towerwinch 10 Tongue 11 Curb side door 12 Forklift pockets 13 Lifting eye...

Страница 13: ...irst Edition First Printing Controls AL4000 Control Panel 1 Light switches 2 Main circuit breaker 3 Hourmeter 4 Ignition switch for engine 5 Engine prime button 6 Alternator failure light 7 Minibreake...

Страница 14: ...witch for engine Turn the ignition switch to the run position and hold the engine prime button down to prime the engine Hold the prime button down and turn the ignition switch to the start position to...

Страница 15: ...ection 2 Tower 3 inch section 3 Tower 4 inch section 4 Coil cord sleeve 5 Leveling jack 6 Fender 7 Tire 8 Ballasts located inside cabinet 9 Towerwinch 10 Tongue 11 Curb side door 12 Forklift pockets 1...

Страница 16: ...AL4000 AL5000 PartNo 116416 Controls AL5000 Control Panel 1 Light switches 2 Main circuit breaker 3 Hourmeter 4 Ignition switch for engine 5 Engine prime button 6 Alternator failure light 7 Minibreake...

Страница 17: ...witch for engine Turn the ignition switch to the run position and hold the engine prime button down to prime the engine Hold the prime button down and turn the ignition switch to the start position to...

Страница 18: ...t Edition First Printing 16 AL4000 AL5000 PartNo 116416 External Power Access AL5000 20kW Option External Power Access 1 Breakers 2P 30A 240V 2 Receptacle GFI 20A 120V 3 Breaker Mini 1P 20A 4 Receptac...

Страница 19: ...ift The inspection is designed to discover if anything is apparently wrong with a machine before the operator performs the function tests The pre operation inspection also serves to determineifroutine...

Страница 20: ...ut torque Add air to tires if needed See Maintenancesection Check the following components or areas for damage improperly installed or missing parts and unauthorizedmodifications o Electrical componen...

Страница 21: ...as it was intended Function Test Fundamentals The function tests are designed to discover any malfunctions before the machine is put into service The operator must follow the step by step instructions...

Страница 22: ...hine and raise the wheels off the ground Level the machine using only the leveling jacks 8 Check the bubble level where equipped on the front of the machine to make sure the machine is level 9 Ground...

Страница 23: ...rn and practice the principles of safe machine operation contained in this operator s manual 1 Avoid hazardous situations 2 Alwaysperformapre operation inspection 3 Always perform function tests prior...

Страница 24: ...o 2 diesel fuel only 2 851310 Label Attention all jacks must be 3 851545 Warning Electric shock hazard 1 851550 Label Lifting eye 2 851640 Label Tower operating instructions 2 851790 Label Attention t...

Страница 25: ...PartNo 116416 AL4000 AL5000 23 Operator s Manual First Edition First Printing Inspections AL4000 AL5000...

Страница 26: ...s section provides instructions for each aspect of machine operation It is the operator s responsibility to follow all the safety rules and instructions in the operator s manual Only trained and autho...

Страница 27: ...start is turnedon The timer is used to automatically start the engine and turn on the lights at a preset time To program the timer 1 Move the engine start switch to timed start 2 On the timer move the...

Страница 28: ...e photocell 1 Move the engine start switch to timed start 2 Move the photocell switch to on Operation of Tower 1 Remove the tower travel lock pin from the cradle located on the rear of the cabinet 2 R...

Страница 29: ...the steering wheel firmly and let up on the gas pedal Do not apply the brakes Do not turn sharply Slow down to under 25 mph 40 km h Gradually turn the steering wheel to get back on the road Proceed w...

Страница 30: ...olely responsible for making sure machines are properly secured and the correct trailer is selected pursuant to US Department of Transportationregulations otherlocalized regulations and their company...

Страница 31: ...capacity loading surfaces and straps or lines are sufficient to withstand the machine weight See the serial plate for the machineweight Lifting the Machine With a Crane Fully lower and retract the to...

Страница 32: ...ed by the operator Scheduled maintenance inspections shall be completed by qualified service technicians according to the manufacturer s specifications and the requirements specified in the responsibi...

Страница 33: ...over hazard Do not use temporary flat tire repairproducts Maintaining the tires and wheels in good condition is essential to safe operation and good performance Tire and or wheel failure could result...

Страница 34: ...n configurations See serial label for specific machine weight Tongue weight AL4000 100 lbs 45 kg AL5000 220 lbs 100 kg Tire size U S AL4000 ST205 75R15 Load C AL5000 ST205 75R15 Load C Engine type AL4...

Страница 35: ...nie Industries If NHTSA receives similar complaints it may open an investigation and if it finds that a safety defect exists in a group of vehicles it may order a recall and remedy campaign However NH...

Страница 36: ...9 0 4202 8852 20 Genie U K Phone 44 0 1476 584333 Fax 44 0 1476 584334 Genie Mexico City Phone 52 55 5666 5242 Fax 52 55 5666 3241 Before Driving On The Road Before Towing Boom hold down latch is secu...

Отзывы: