Operator's Manual
First Edition • First Printing
20
AL4000 • AL5000
Part No. 116416
Setup
1 Position the light tower at the desired work site.
2 Chock the wheels.
3 Disconnect the trailer lights and safety chains.
4 Pull the release pin on the tongue jack and
rotate into place.
5 Turn the jack handle to lower the foot pad and
raise the tongue of the machine enough to clear
the tow vehicle.
6 Release the spring pin on the front and back
outriggers and slide each outrigger out until the
spring pin engages. Rotate the outriggers into
position.
7 Turn the outrigger jack handles to level the
machine and raise the wheels off the ground.
Level the machine using only the leveling jacks.
8 Check the bubble level (where equipped) on the
front of the machine to make sure the machine
is level.
9 Ground the light tower according to
your local electrical code. A grounding
rod is supplied inside the cabinet and
grounding lug is provided on the chassis near
the base of the tower.
Note: Always r efer to your local electrical code.
10 Manually start the engine. See Operating
Instructions section.
Inspections
Test the Lights
Note: Make sure the engine is running.
16 Turn on the main circuit breaker switch.
17 Turn on the light switches.
Result: All lights should come on.
Note: If the lights are already hot from being
operated, they will require 5-10 minutes to cool
before they will come on again.