Make sure Quartus Prime 18.1 Standard Edition is installed to the host PC.
o
Connect the T-Core board (J2) to the host PC via the USB cable.
o
Go to TCORE-RISCV-FreedomE300/Quartus_Project/TCORE_FreedomE300/demo_batch
directory using command:
cd TCORE-RISCV-FreedomE300/Quartus_Project/TCORE_FreedomE300/demo_batch.
o
Execute command: sh programming_pof.sh to configure the FPGA.
◆
Download bitstream to QSPI Flash
Follow the procedures below to compile a C-code project and download the generated binary file
into QSPI Flash via on-board RISC-V JTAG.
o
Remove the USB Blaster Cable from T-Core to power off the board.
o
Set SW2.1=
1
and SW2.2=
0
as
to ensure MAX10 is off JTAG chain, and
RISC-V is on JTAG chain.
Figure 3-16 SW2 Setting
o
Connect the T-Core board (J2) to the host PC via the USB cable.
o
Change the directory to TCORE-RISCV-FreedomE300/freedom-e-sdk using cd command.
o
Compile software by executing command: make software.
o
Download the binary file by executing command: make upload.
Содержание T-Core
Страница 1: ...T Core User Manual 1 www terasic com January 14 2020 ...
Страница 45: ...T Core User Manual 44 www terasic com January 14 2020 Figure 3 17 Compile and download process ...
Страница 65: ...T Core User Manual 64 www terasic com January 14 2020 Figure 5 7 Using T Core board to program the DE10 Pro ...