tepro Danbury Скачать руководство пользователя страница 16

16

t

Setting up the pizza oven

Attention  Risk of damage!

During use, the screws can loosen slowly.

 

– Check that all screws are tightened before use. If necessary, 

tighten all screws to guarantee stability.

 

– Place the pizza oven outdoors on a level, heat-resistant, solid 

surface.

 

– When using the pizza oven, the floor and wall surfaces can 

occasionally be contaminated, e.g. from splashes of fat. Make 

sure that the subsurface is adequately protected against such 

contamination.

before baking 

•  Wash off any coarse production residues with warm water,

avoiding the use of detergents or detergents.

Pre-firing

•  Before baking for the first time, heat up the pizza oven for 

a min. 15 minutes with a closed lid and high flame without 

food. The heat cleans the internal parts and burns away the 

finishing residues of coloured parts. In the process, odours 

and some smoke may develop. However, this is harmless and 

only lasts a short time. Ensure sufficient ventilation.

Pre-heating

•  It is recommended to preheat the pizza oven for about 10-15

minutes before each use. 

Pizza stone

• DO NOT use the stone over an open flame.
•  Avoid extreme temperature fluctuations in the stone.

DO NOT put frozen food on a hot stone.

•  The stone is fragile and can break if hit or dropped.
•  The stone is very hot during use and will stay hot for a long 

time after use.

• DO NOT cool a hot stone with water.

Operation

Danger   Risk of burning!

The pizza oven, contained pellets and baking items 

get very hot during use so that contact with them can 

cause serious burns.

 

– Keep away from hot parts as any contact can cause severe 

burns.

 

– Always wear oven or BBQ gloves when baking. (Glove Cate-

gory II with regard to heat protection, e.g. DIN-EN 407. Glove 

must match the PSA regulation.)

 

– Use long-handled utensils with heat-resistant handles only.

 

– Do not wear any clothing with wide sleeves.

1.  Open the vent chimney (01)  

6

Operation guideline

3. Add pellets (about 380 grams (0.8lb), reach to about 2/3 of the pellet collector (02).

4. Use the ignition gun to light the pellets directly.

1. Open the chimney (01) lid. 

2. Close the door (08).

2.  Close the door (08). 

 

6

Operation guideline

3. Add pellets (about 380 grams (0.8lb), reach to about 2/3 of the pellet collector (02).

4. Use the ignition gun to light the pellets directly.

1. Open the chimney (01) lid. 

2. Close the door (08).

Step 6

Assemble the pizza peel (9).

5

3. Connect Gas hose & Regulator (3) to Pizza Oven (2).

4. Assemble the pizza shovel.

WARNING

• Please always keep the gas bottle in upright position.
• If the appliance is not in use, the gas must be turned off at the supply cylinder.
• The minimum distance for the appliance and the 20lb gas tank is 40 inches apart.

CONNECTING THE LIQUID PROPANE GAS CYLINDER

1. The cylinder valve should be in OFF position.
2. Make sure the burner valve is in OFF position.
3. Inspect the valve connections, port and regulator assembly. Remove debris and inspect the hose for damage.
4. When connecting the regulator assembly to the valve, use your hand to tighten the nut clockwise until it tops.
5. Use of a wrench could damage the quick coupling nut and result in a hazardous situation.
6. Open the cylinder valve fully by turning the valve counterclockwise.
7. Before lighting the oven, use a soap and water solution to check all connections for leaks.
8. If a leak is found, turn the cylinder valve OFF, and do not use the oven until local liquid propane dealer make repairs.

CLOSE THE LIQUID PROPANE GAS CYLINDER

1.Turn the oven burner valve OFF and make sure the oven is cool.
2. Turn the liquid propane cylinder valve OFF by turning clockwise until it stops.
3. Detach the regulator assembly from the cylinder valve by turning the quick coupling nut counterclockwise.
4. Place dust cap for cylinder valve outlet whenever the cylinder is not in use.

LEAK TESTING

GENERAL

Although the gas connections of the appliance are leak tested prior packing and shipment, a complete test must be performed at the installation site 
and before each use.Check all the gas connections for leak testing using the procedure listed below. If the smell of gas is detected at any time, you 
should immediately stop using and check the entire system for leaks.

BEFORE TESTING

Make sure all packing material has been removed from the appliance.
Make a solution of one part liquid detergent and one part water. You will need a spray bottle, brush or rag to apply the solution to the fittings.

A

B
C
D

(09)

P21098_TEPRO_1173_PelletPizzaofen_Danbury_DE_GB_210831.indd   16

31/8/2021   12:36 PM

Содержание Danbury

Страница 1: ...Bedienungsanleitung PELLET PIZZAOFEN Danbury t Operating Manual PELLET PIZZA OVEN Danbury Version 2022 Art Nr 1173 P21098_TEPRO_1173_PelletPizzaofen_Danbury_DE_GB_210831 indd 1 31 8 2021 12 36 PM...

Страница 2: ...3 A B C D 09 P21098_TEPRO_1173_PelletPizzaofen_Danbury_DE_GB_210831 indd 2 31 8 2021 12 36 PM...

Страница 3: ...herheitshinweise 4 5 Montage 5 8 Vorbereitung 5 Ben tigtes Werkzeug 5 Pizzaofen zusammenbauen 5 8 Pizzaofen aufstellen 8 Vor dem Backen 8 Pizzastein 8 Bedienung 8 9 Wartung und Reinigung 9 Entsorgung...

Страница 4: ...ignalsymbole Gefahr Hohes Risiko Missachtung der Warnung kann zu Sch den f r Leib und Leben f hren Achtung Mittleres Risiko Missachtung der Warnung kann Sachsch den verur sachen Vorsicht Geringes Risi...

Страница 5: ...ng kommen Gefahr Gefahren f r Kinder Kinder k nnen sich beim Spielen in der Verpackungs folie verfangen und darin ersticken Lassen Sie Kinder nicht mit den Verpackungsfolien spielen Achten Sie darauf...

Страница 6: ...in den Pizzaofen 6 2 Insert the Pellet collector 02 into the Ash tray 04 Put the Ash tray 04 into the Main body 06 3 Insert the Chimney 01 into the Main body 06 then rotate the chimney 01 90 clockwis...

Страница 7: ...6 08 Schieben Sie den Flammenschutz 05 und den Pizzastein 07 in den Pizzaofen 06 Step 5 4 Place the flame guard 05 and the pizza stone 07 inside the main body 06 5 Attach Door with handle 08 6 Assembl...

Страница 8: ...eline 3 Add pellets about 380 grams 0 8lb reach to about 2 3 of the pellet c 1 Open the chimney 01 lid 2 Close the door 08 2 Schlie en Sie die T r 08 Operation guideline 3 Add pellets about 380 grams...

Страница 9: ...remaining ash cool down naturally for at least 60 min Wear heat resistant gloves and use the handle 03 to carefully remove the pellet collector 02 Pouring the ashes into a metal bucket with water 7 O...

Страница 10: ...ionalen Richtlinien Dies wird durch die CE Kennzeichnung best tigt ent sprechende Erkl rungen sind beim Hersteller hinterlegt Technische Daten Produkt Gewicht Gesamtma e Fassungsverm gen Pellet Kammer...

Страница 11: ...structions 12 13 Assembly 13 16 Preparation 13 Required tools 13 Assembling the pizza oven 13 16 Setting up the pizza oven 16 Before baking 16 Pizza Stone 16 Operation 16 17 Cleaning and maintenance 1...

Страница 12: ...caused by improper use of this product For your safety Signal symbols Danger High risk Disregarding this warning can lead to danger to life and limb Attention Medium risk Disregarding this warning ca...

Страница 13: ...to contact with food Danger Hazards for children Children may become entangled in packaging foil and suffocate Never let children play with packaging material Make sure that children do not place any...

Страница 14: ...2 Insert the Pellet collector 02 into the Ash tray 04 Put the Ash tray 04 into the Main body 06 3 Insert the Chimney 01 into the Main body 06 then rotate the chimney 01 90 clockwise How to use your O...

Страница 15: ...06 08 Push the flame protection 05 and the pizza stone 07 into the pizza oven 06 Step 5 4 Place the flame guard 05 and the pizza stone 07 inside the main body 06 5 Attach Door with handle 08 6 Assemb...

Страница 16: ...3 Add pellets about 380 grams 0 8lb reach to about 2 3 of the pellet colle 1 Open the chimney 01 lid 2 Close the door 08 Step 6 Assemble the pizza peel 9 5 4 Assemble the pizza shovel WARNING Please a...

Страница 17: ...the lid is always closed only open it when adding pellet 8 Let the pellets burn through and make the remaining ash cool down naturally for at least 60 min Wear heat resistant gloves and use the handl...

Страница 18: ...licable European and national Directives DIN EN 1860 1 Technical Data Product Weight Dimensions Capacity pellet chamber Pizza stone size Pizza peel size Item no 1173 Pellet Pizza oven Danbury approx 1...

Страница 19: ...P21098_TEPRO_1173_PelletPizzaofen_Danbury_DE_GB_210831 indd 19 31 8 2021 12 36 PM...

Страница 20: ...P21098_TEPRO_1173_PelletPizzaofen_Danbury_DE_GB_210831 indd 20 31 8 2021 12 36 PM...

Отзывы: