Step 21
8
While holding the peak pole in place, insert the remaining pin through the hole in the pole to secure it in the extended position.
HEXAGON PAVILION
Страница 1: ...SETUP INSTRUCTIONS HEXAGON PAVILION...
Страница 2: ...h that any overhead powerlines are duly noted and avoided during the tent erection process THANK YOU FOR YOUR PURCHASE TentCraft Inc in no way represents the estimated holding power to be true in all...
Страница 3: ...opening the leg so it forms a 90 degree angle Step 3 Lock this angle into place by rotating the angle bracket up and lining its holes up with the holes in the shoulder piece Insert the pin into the h...
Страница 4: ...tom of the legs Have someone hold it in place Step 7 A second person will pick up remaining legs and install them one at a time using the process explained in step 5 Once all legs are installed the st...
Страница 5: ...om of the leg into the hole found on the inside edge of the wall panel Repeat this step for the opposite side of the wall panel Step 11 Attach the remaining ve wall panels using steps 9 and 10 It may...
Страница 6: ...om underneath the counters at each leg take the remaining pin and slide it through the counter support and metal counter tabs to secure both counters to the counter support Repeat this step at the rem...
Страница 7: ...the pocket on the inside of the roof over the small metal tab on the shoulder piece This attaches the roof to all six shoulder pieces Step 19 Extend the arms of each shoulder piece to pull the canopy...
Страница 8: ...Step 21 8 While holding the peak pole in place insert the remaining pin through the hole in the pole to secure it in the extended position HEXAGON PAVILION...