
MAINTENANCE
3-29
95GR MM199 (10---89)
HOPPER FUSIBLE LINK
The hopper fusible link is a device which, in case of
a fire in the hopper, allows the hopper fire door to
close, cutting off air to the fire.
The fusible link is positioned between the hopper fire
door and the hopper frame. It is accessible through
the hopper inspection door.
If a loss of dust control is noticed, check the fusible
link for breakage or failure due to heat.
TO REPLACE HOPPER FUSIBLE LINK
1. Stop the engine and engage the machine
parking brake.
WARNING: Always stop the machine on a
level surface, stop the engine and engage
the parking brake before working on the machine
to keep it from rolling.
2. Open the hopper inspection door.
3. Remove the existing pieces of fusible link and
their retaining clips.
4. Slide a new fusible link over the link mounting
pins.
A
B
C
D
01483
FUSIBLE LINK INSTALLATION
A. Fire Door
B. Retaining Clip
C. Fusible Link
D. Fire Door Hook
5. Push the link retaining clips onto the mounting
pins.
6. Open the fire door.
7. Place the fire door hook over the middle of the
fusible link.
8. Close the hopper inspection door.
DEBRIS HOPPER
The debris hopper collects debris swept up by the
main brush. The hopper has one regularly scheduled
adjustment --- hopper floor clearance. Check it after
every 50 hours of operation. Proper floor clearance
must be maintained to prevent the hopper from
trailing debris.
TO CHECK AND ADJUST HOPPER FLOOR
CLEARANCE
1. Place the hopper in the “operating” position,
stop the engine, and engage the parking
brake.
WARNING: Always stop the machine on a
level surface, stop the engine, and engage
the parking brake before working on the machine
to keep it from rolling.
2. Slide a 1.5 in (40 mm) thick block under each
side of the rear of the hopper. This is the
amount of floor clearance needed by the
hopper. If the hopper needs adjustment,
continue.
Содержание 96GR
Страница 1: ... Operator Manual ...
Страница 12: ...SPECIFICATIONS 95GR MM199 10 89 1 2 ...
Страница 16: ...SPECIFICATIONS 95GR MM199 10 89 1 6 ...
Страница 18: ...OPERATION 95GR MM199 10 89 2 2 ...
Страница 36: ...OPERATION 95GR MM199 10 89 2 20 ...
Страница 47: ...MAINTENANCE 3 11 95GR MM199 10 89 04307 HYDRAULIC SCHEMATIC ...
Страница 60: ...MAINTENANCE 95GR MM199 10 89 3 24 04309 ELECTRICAL SCHEMATIC ...
Страница 61: ...MAINTENANCE 3 25 95GR MM199 10 89 01502 ELECTRICAL SCHEMATIC ACCESSORIES ...
Страница 82: ...APPENDIX 95GR MM199 10 89 4 2 ...