![Temptek PTK Series Скачать руководство пользователя страница 22](http://html.mh-extra.com/html/temptek/ptk-series/ptk-series_instruction-manual_1085894022.webp)
PTK Series Polyethylene Pump Tank Station with Checkmate Control System
Page: 22
TEMPTEK, INC.
525 East Stop 18 Road Greenwood, Indiana 46142
317-887-6352 Fax: 317-881-1277
Email: [email protected]
16.
Clean pump casing, cavities, impeller and O-ring before reassembly.
17.
Mate the motor and motor adapter to the pump casing. Reinstall the pump casing
bolts.
18.
Reconnect the water cooling lines to the pump adapter (if applicable).
19.
Reconnect the motor power cord and leads.
20.
Restore all cover panels as were removed.
E.
When the pump seal replacement procedure is complete, the operator may restart the
unit according the section 3. In some cases, a new pump seal will experience a small
amount of leakage for a short time. This is normal. After operating a few moments, the
new seal will take action and the leak will stop.
Содержание PTK Series
Страница 30: ...Page 30 END 2019 TEMPTEK INC RE 09 30 2019 ...