Figure 56: Removal of bolts from skid
Start-up and operation
For information regarding system start-up,
sequences of operation, the BACnet
®
points list, and
the faults list, refer to the
Tempmaster Omni
™
Premier
25 Ton to 80 Ton Rooftop Units R-410A Start-Up and
Operation Guide (5881376-TSG-A)
that shipped with
the unit.
Tempmaster
®
Omni™ Premier 25 Ton to 80 Ton Rooftop Units Installation and Maintenance Guide
91
Tempmaster