
- 1 -
PREPERATION FOR OPERATION
After removing scale from its package, installation could be accomplished by following instructions given
in “ASSEMBLY WARNINGS” part.
In models using post part, after setting the post to desired angle, screw the connecting screw to stabilize
it.
Place the scale on a horizontal stable base. Avoid disturbing environmental conditions such as shocks,
vibrations and air currents.
For setting the scale parallel to the base just turn the adjustable feet in order to stable the spirit level.
(The bubble of the spirit level must be within the indicating circle)
Attach the adaptor to an electric outlet that has ground (220V), and connect it to adaptor input. There is
an on/off key near the adaptor input. You can operate scale from this key.
NOTE
: If scale has a rechargeable battery (sealed lead type), it should be charged at least 8 hour
before first operation.
NOTE
: There are protecting bands on the back display and post display. Taking out these bands make
clear seeing the display. There may be white or blue band to protect stainless steel part of the scale. It
should be taken off before using the scale.
ASSEMBLY WARNINGS
COUNTING SCALE HOLDING WIRE:
ASSEMBLY OF COUNTING SCALES:
Connect post to the bottom chassis with metric 10x25 imbus bolts.
- 2 -
Attach the shield with 10x25 hexagon
Attach indicator to the post like above. Do not
bolts.
remove after looked up. To remove indicator from
post, remove two screws near the post connector.