TelliQ TQ12 ver 2 Скачать руководство пользователя страница 4

Mounting instructions for TQ12 ver 2 Production tracker

 
 

- Installation with relay to collect production data and constant positioning 

This scenario should be used when the unit shall collect the machine's running and production hours, and alarms. This scenario also 
supports constant positioning, which means that the device can send in position after the main switch has been turned off. 
This is done by connecting the digital inputs (running hours, production hours and alarms) through relays that break when the main power 
switch is turned off. The relay should be NO (normally opened) or alternating 1 pole (12-24VDC).  
Suitable relays can be ordered from TelliQ AB. 
 

NOTE! If the unit is installed as described below without relay, running and production hours will be counted when the main switch is off 
and provide incorrect data in the TelliQ system and increase the power consumption of the machine's battery. 
 

Red

 wire connects to b at a suitable location. Use a 2 or 3 A fuse to protect the unit. The power must be constant when 

machine is running 

Black 

wire connected to battery - not chassis GND.

 

Yellow

 wire is connected to the signal when the engine is switched on (hour counter), such as the ignition by relay as shown in the 

picture below. The signal should be 7.5-30 VDC. 

Optional, 

White/Green

 wire is connected to the signal that is high when the machine produces. The signal should be 2.5-30 VDC. 

Optional, 

White

 wire is connected to the alarm (2.5-30 VDC). 

The other wires are used for TelliQ accessories. 

 

 

 
 

NOTE! The unit consumes < 6mA when the machine is not in use 

 

 

Page ​ 

4 (8)

 

 

Содержание TQ12 ver 2

Страница 1: ...ahamsson 2018 04 24 TQ 18 196 2 Production tracker Reviewed by Joel Verpers TQ12 ver 2 Production tracker Mounting instruction Contact TelliQ Customer Center after each installation for function contr...

Страница 2: ...he following scenarios Main power switch on negative side main power switch is located on the machine negative side o Installation for collecting positioning and production data running hours etc Main...

Страница 3: ...or some hours after the main power switch is turned off In this scenario the unit draws no power from the battery when the main power switch is turned off Red wire connects to battery at a suitable lo...

Страница 4: ...led as described below without relay running and production hours will be counted when the main switch is off and provide incorrect data in the TelliQ system and increase the power consumption of the...

Страница 5: ...ion after the main switch has been turned off Red wire connects to battery at a suitable location before the main switch Use a 2 or 3 A fuse to protect the unit The power must be constant when machine...

Страница 6: ...off In this scenario the unit draws no power from the battery when the main power switch is turned off Red wire connects to battery at a suitable location after the main switch Use a 2 or 3 A fuse to...

Страница 7: ...is in deep sleep mode Off Causes GNSS module is short circuited Unit is powerless Device is not working or Unit firmware is being flashed It can take up to 5 minutes before the unit has a connection...

Страница 8: ...ORANGE DOUT1 N A in standard application VIOLET DOUT2 N A in standard application GREEN 1WIRE DATA N A in standard application BLUE 1WIRE POWER N A in standard application GSM Quad band module with in...

Отзывы: