TelliQ TQ12 ver 2 Скачать руководство пользователя страница 2

Mounting instructions for TQ12 ver 2 Production tracker

 
 

- TQ12 Production Tracker 

- Delivery from TelliQ 

 

Unit 

TQ12 ver 2 Production tracker  
Changes since former version 

Black wire connects to GROUND 

Blue wire connects to 1WIRE POWER 

Unit has 3 DIN, 2 DOUT and 1 AIN 

Unit has 10 wires 

Relay 

(Accessories) 

RFID reader 

(Accessories) 

 

 
- Mounting materials  

Mounting materials and tools shall be provided by the installer. 
When installing TQ12 you will need:

 

Cable ties or double-sided tape 

Terminal block 

Fuse Holder 

Fuse 2-3A 

Cables for extension( depends on installation) 

 

 

 

- Important to know before installing the TQ12 Production Tracker 

TQ12 Production tracker is suitable for installation on construction machines. The unit must be installed differently depending on whether 
the machine's main power switch located on the battery positive or negative side, as well as the function desired by the device. Electrical 
wiring is divided into the following scenarios: 
 

Main power switch on negative side 

(main power switch is located on the machine negative side) 

o Installation for collecting positioning and production data (running hours, etc.) 

Main power switch on positive side 

(main power switch is located on the machine positive side) 

o Installation for collecting positioning and production data (running hours, etc.) 

 

 

- Mounting recommendations 

The unit should be placed in an area where there are no disturbing elements (i. e. metal) over or besides the unit. The unit has built-in 
antennas, which makes the location of the unit important for achieving good coverage to the sky.  
The unit should be mounted as horizontal as possible, do not tilt the device more than 30 degrees, to ensure proper operation. 
 
The unit needs an undisturbed view to the sky for full functionality and connectivity.  
 
Fasten the unit firmly using cable ties in the dedicated holes on the unit’s enclosure. Make the machine powerless by disconnecting the 
battery before connecting the unit to the machine. 
 
Note if the main power switch is placed on the battery's negative side or the positive side. 
 

 

Page ​ 

2 (8)

 

 

Содержание TQ12 ver 2

Страница 1: ...ahamsson 2018 04 24 TQ 18 196 2 Production tracker Reviewed by Joel Verpers TQ12 ver 2 Production tracker Mounting instruction Contact TelliQ Customer Center after each installation for function contr...

Страница 2: ...he following scenarios Main power switch on negative side main power switch is located on the machine negative side o Installation for collecting positioning and production data running hours etc Main...

Страница 3: ...or some hours after the main power switch is turned off In this scenario the unit draws no power from the battery when the main power switch is turned off Red wire connects to battery at a suitable lo...

Страница 4: ...led as described below without relay running and production hours will be counted when the main switch is off and provide incorrect data in the TelliQ system and increase the power consumption of the...

Страница 5: ...ion after the main switch has been turned off Red wire connects to battery at a suitable location before the main switch Use a 2 or 3 A fuse to protect the unit The power must be constant when machine...

Страница 6: ...off In this scenario the unit draws no power from the battery when the main power switch is turned off Red wire connects to battery at a suitable location after the main switch Use a 2 or 3 A fuse to...

Страница 7: ...is in deep sleep mode Off Causes GNSS module is short circuited Unit is powerless Device is not working or Unit firmware is being flashed It can take up to 5 minutes before the unit has a connection...

Страница 8: ...ORANGE DOUT1 N A in standard application VIOLET DOUT2 N A in standard application GREEN 1WIRE DATA N A in standard application BLUE 1WIRE POWER N A in standard application GSM Quad band module with in...

Отзывы: