ONT180C Installation and Turnup Guide

Page 20 of 38

Installation

This chapter provides location selection guidance and procedures, tool and supplies

lists, and installation procedures for the Tellabs ONT180C and related Tellabs

accessories.

Installing an ONT180C includes:

1. Unpacking the ONT and related accessories and checking for shipping damage

2. Physically placing the ONT and related accessories at the install location, and

mounting it to a wall or other surface if required

3. Connecting the ONT to DC power

4. Connecting the optical fiber cable to the ONT

5. Verifying a solid green PON LED Indicator on the ONT after it boots up

If multiple ONTs are to be installed, the next ONT Install can proceed while the

previously installed ONT downloads new firmware.

If the upstream equipment (OLT) is not yet in operation when the ONT is physically

installed it is not possible to place the ONT into operation.

Application

The Tellabs ONT180C is for indoor use, only, in temperatures ranging from 32° F to

104° F (0° C to 40° C) and relative humidity ranging from 5% to 85%.

Location Selection and Planning

The location of the ONT must take into account the space, power, and cabling

requirements of the ONT and attached devices.

The fiber cable drop should be installed so that it is near the location selected for

installing the ONT. Because fiber cables are typically not altered in the field, ensure that

Содержание ONT180C

Страница 1: ...Copyright 2021 Tellabs All Rights Reserved ONT180C Installation and Turnup Guide...

Страница 2: ...responsibility for errors or omissions contained herein or ii liability for any damages resulting from the use of information contained herein Information in this publication is subject to change wit...

Страница 3: ...of Contents Tellabs Information 2 Copyright 2 Trademarks 2 Proprietary 2 1 Tellabs ONT180C Installation and Turn Up Guide 4 1 1 Description 6 1 2 Site Preparation 13 1 3 Safety Precautions 17 1 4 Inst...

Страница 4: ...norama EMS Introduction This guide describes the Tellabs ONT180C optical network terminal ONT its features status indicators installation The ONT180C is part of the Tellabs 100 series of ONTs for pass...

Страница 5: ...avings all within the Tellabs exclusive high security All Secure PON Intended Audience This document is intended for technicians responsible for Preparing the install location Unpacking and installing...

Страница 6: ...rates 802 3bt 4PPoE Type 3 PSE capable of Class 1 through 6 supplying up to 60W on a single port 51W at the PD for powering downstream Powered Devices PD with 140 W total PoE output for the ONT when...

Страница 7: ...on IP ToS DSCP to 802 1p mapping QoS based on VLAN ID 802 1p bit ToS DSCP Marking remarking of 802 1p IGMP v2 v3snooping Up to 255 MAC addresses per port IPv6 capable for enterprise services Upstream...

Страница 8: ...ent of services to a port via the use of Network Access Control NAC with fall back to a Guest VLAN The ONT supports IEEE 802 1x port based authentication and MAB This prevents unauthorized access to p...

Страница 9: ...nector for Single Mode Fiber SMF cable The connector is protected by a small plastic cover located at the right hand corner of the back panel when viewed from the rear ONT180C Indicators The top of th...

Страница 10: ...PoE No PD Detected Data No data detected Green Blink Link Up PoE No PD Detected Data Data detected Amber Link Up PoE Powering PD Data No Data Detected Amber Blink Link Up PoE Powering PD Data Data De...

Страница 11: ...40 C Operating humidity 5 to 85 non condensing Interfaces and Connectors UPS Special connector for DC power input from the adapter recommended An optional Uninterruptible Power Supply aka Backup Batt...

Страница 12: ...ass B EN55022 2010 EN55024 2016 and EN 61000 3 3 2008 Safety UL 60950 1 Ed 02 Laser ITU T Rec G 984 2 Class B G983 3 FDA 21 CFR 1040 10 and 1040 11 Class I IEC 60825 Class I Ethernet IEEE 802 1ad 802...

Страница 13: ...g Wall Mounting Bracket optional accessory Dimensions 7 25 x 4 5 x 0 5 in 18 42 x 11 4 x 1 27 cm W x D x H Interface bracket that mounts to existing Tellabs Fiber Management Brackets optional accessor...

Страница 14: ...FDA 21 CFR 1040 10 and 1040 11 EMC FCC 47 CFR part 15 Class B EN55022 2010 EN55024 2016 and EN 61000 3 3 2008 Safety UL 60950 1 Ed 02 Laser ITU T Rec G 984 2 Class B G983 3 FDA 21 CFR 1040 10 and 1040...

Страница 15: ...hipping container or be shipped separately The following table gives the 180C part numbers and accessories associated with the 180C Part Number Description Comments 81 11G ONT180C R6 ONT180C 8GE Non T...

Страница 16: ...supplied on a local power circuit is 100VA or approximately 100W as required by the NEMA class 2 electrical code Outside the box A reusable adhesive label with the ONT serial number and barcode printe...

Страница 17: ...separated at recycling centers By participating in the separate collection of identified products you will help with the correct disposal of these items and contribute to the ongoing protection of ou...

Страница 18: ...tor on a cable or a device Permanent eye damage or blindness can occur quickly from laser radiation Electrical Safety DANGER Do not open the enclosure unless directed to do so by Tellabs technical sup...

Страница 19: ...ONT180C Physical Installation Desktop Installation Mounted to a Wall Installing the Mounting Bracket Storing Excess Optical Fiber Cable Length Inside the Bracket Attaching the ONT to the Wall Mountin...

Страница 20: ...Indicator on the ONT after it boots up If multiple ONTs are to be installed the next ONT Install can proceed while the previously installed ONT downloads new firmware If the upstream equipment OLT is...

Страница 21: ...of a desk or shelf in any orientation using screws This can keep the unit and cables out of sight and out of the way Powering the ONT180C The ONT180C requires 54 VDC at up to a maximum of 2 8 amps at...

Страница 22: ...rs preinstalled A composite cable that is somewhat longer than the actual shortest route distance from the ONT180C to the optical splitter should be obtained Excess cable length can be loosely coiled...

Страница 23: ...for installations using remote bulk DC power or the alternate AC adapter Power drill and drill bits sized appropriately for screw pilot holes and drywall and masonry anchor holes sizes required will...

Страница 24: ...der for proper quantities and for shipping damage If a shortage or damage is found contact the Tellabs Technical Assistance Center TAC immediately If all items are accounted for and in good condition...

Страница 25: ...ounting the ONT180C decide on the best orientation for access and ease of use Up to 11 cables may be attached to the rear edge of the ONT Also orienting it such that the user can see the LED Indicator...

Страница 26: ...the optical fiber cable about 10 inches from the end of the connector with a Sharpie or other permanent marker or a piece of electrical tape 2 Position the mark on the cable just outside bracket and p...

Страница 27: ...ra cost Contact your Tellabs sales representative for details and ordering information Power Using an AC Adapter An optional AC adapter plugged into an AC outlet near the ONT installation location pro...

Страница 28: ...remote bulk DC cable taking care to ensure the screws are tightened properly The polarity marked on the ONT rear panel above the DC 54V power connector must be observed Note that if the connector has...

Страница 29: ...from laser radiation 1 Remove power from the ONT 2 Turn the ONT upside down with the edge having all the connectors facing away 3 Press on the ONT optical fiber cable connector cover with a thumb and...

Страница 30: ...Position the ONT optical fiber cable connector cover near the cover of the ONT case with the optical fiber cable in the slot in the cover 8 Slide the cover back onto the ONT case until it clicks into...

Страница 31: ...ed to the bundle or unused cables to be removed from the bundle easily An optical fiber cable can perform poorly or be damaged if the minimum bend radius of the cable is exceeded Any coil of fiber mus...

Страница 32: ...ble between the OLT and ONT If the ONT detects an optical signal but is not accepted on the PON it will blink green with a 1 2 second cadence If the OLT is downloading the ONT which it will often do w...

Страница 33: ...ree 1 800 690 2324 option 1 International 1 630 798 9900 option 1 France 01 85 64 04 05 option 1 Tellabs Warranty Repair Center The Tellabs Repair Center is staffed Monday Friday 6 00 AM 4 00 PM CT ex...

Страница 34: ...ONT180C Installation and Turnup Guide Page 34 of 38 North America Toll Free 1 800 690 2324 option 6 International 1 630 798 9900 option 6 France 01 85 64 04 05 option 6...

Страница 35: ...GUI This can be done in one of several ways Configuration via the Unexpected ONT menus Manual Pre configuration Auto Configuration via Templates Bulk configuration via Excel Files Add Via Unexpected...

Страница 36: ...he unconfigured state If the EMS has already put N in this field it is typically because the ONT already exists on the system and needs to be deleted from its previous location ONT ID An unused ONT ID...

Страница 37: ...d upon installation the unit would be automatically accepted and go into service without any further manual intervention On the Panorama GUI select the correct PON and then right click and select Add...

Страница 38: ...You can learn more about configuring ONTs via Auto configuration and using Templates to define all the default settings for ONT configuration in the following Application Note ENG 010407 ONT Auto Con...

Отзывы: