ONT180C Installation and Turnup Guide
Page 10 of 38
Green
Blink Fast
The PON is up and ONT is attempting to register on the PON. If Auto Configuration is
not enabled, use Unknown ONT option on the Panorama PON to register ONT.
Green
Blink Slow
The board is performing a software download.
Green
The PON is up and operating normally.
Dark
The ONT is booting
GE1-
GE8
Green
• Link
(Up)
• PoE
(No PD Detected)
• Data
(No data detected)
Green
Blink
• Link
(Up)
• PoE
(No PD Detected)
• Data
(Data detected)
Amber
• Link
(Up)
• PoE
(Powering PD)
• Data
(No Data Detected)
Amber
Blink
• Link
(Up)
• PoE
(Powering PD)
• Data
(Data Detected)
Dark
The Ethernet Port is disabled or link is not detected
ONT180C Manual Controls and Switches
The ONT180C has only one user-operable control:
·
Reset
– This pushbutton resets the ONT
The Reset pushbutton is accessible through a small hole on the right-hand side of the
unit (when viewed from the front).
ONT180C Specifications
ONT180C specifications are listed in Table B.