GE864-QUAD V2 Hardware User Guide
1vv0300841 Rev.5
–
2017-05-11
Reproduction forbidden without Telit Communications S.p.A. written authorization - All Rights
Reserved.
Page 66 of 77
12.3.
Debug of the GE864-QUAD V2 in Production
To test and debug the mounting of the GE864-QUAD V2, we
strongly recommend to foreseen test pads on the host PCB, in
order to check the connection between the GE864-QUAD V2 itself
and the application and to test the performance of the module
connecting it with an external computer. Depending by the
customer application, these pads include, but are not limited
to the following signals:
Ball
Signal
Function
J1, J2, K1, K2
VBATT
Main power supply
A1, A11, D6, F1,
F11, H1, H2, J3,
K3, K4, K5, K6,
L1, L2, L3, L6,
L11
GND
Ground
E7
C103/TXD
Serial data input (TXD) from DTE
H8
C104/RXD
Serial data output (RXD) to DTE
L8
PRWMON
Power ON Monitor
J5
ON/OFF*
Input command for switching power ON or OFF
(toggle command).
A2
RESET*
Reset input
F10
RX_AUX
Auxiliary UART (RX Data from DTE)
D11
TX_AUX
Auxiliary UART (TX Data to DTE)
H4
SERVICE
Service pin shall be used to upgrade the
module from ASC1 (RX_TRACE, TX_TRACE). The
pin shall be tied low to enable the feature
only in case of a SW Update activity. It is
required, for debug purpose, to be connected
to a test pad on the final application.