LE910Cx HW User Guide
1VV0301298 Rev. 33
Page 40 of 128
2021-06-29
Not Subject to NDA
Note: During the Initialization state, the AT commands are not
available. The DTE host must wait for the Activation state before
communicating with the LE910Cx
Figure 5: LE910Cx Initialization and Activation
A flow chart showing the proper turn on procedure is displayed below: