Telguard TG-7FP Installation & Operating Guide
3
56052401 Rev A
Additionally:
•
When the heartbeat transmission over the LTE network is enabled, the communicator can provide
Standard Line Security over the LTE channel.
•
The communicator shall be powered from the UL Listed alarm control panel.
•
The provided tamper switch shall be connected directly to an input zone on the control panel, and the
zone shall be designated as the zone for Tamper Protection. Tamper wires and all other wires
connecting the communicator to the panel shall be in rigid or flexible metal conduit.
BURGLARY SYSTEM INSTALLATIONS IN CANADA: In order to comply with the requirements in the
Standard for Control Units, Accessories and Receiving Equipment for Intrusion Alarm Systems, ULC-
S304, the TG-7FP must meet these requirements (Security Level II):
The TG-7FP communicator must be used in one of the following configurations:
•
Passive communication system line security level P1 (single communication channel); or
•
Line security level P2 (used as backup in conjunction with another communication path such as a
DACT). There is no heartbeat sent in this configuration, only periodic test transmissions.
Additionally:
•
Every 24 hours, a test transmission must be sent to the signal receiving centre over each
communication path. Each communication path shall be monitored for integrity (DACT shall have line
monitoring enabled and the TG-7FP shall have cellular connection supervision enabled). For Level P2,
the working communication path shall report the failure of the other channel within 240s.
•
The TG-7FP shall be used in conjunction with a ULC or c-UL Listed Control Unit/Alarm Panel, which will
supply power to operate the communicator.
•
STC1 and STC2 shall be connected from the communicator to the control panel and designated for
general trouble conditions.
•
The provided tamper switch shall be connected directly to an input zone on the control panel, and the
zone shall be designated as the Tamper Protection zone. Tamper wires and all other wires connecting
the communicator to the panel shall be in rigid or flexible metal conduit.