background image

12 

PRISM MPX2-25 Installation and Safety Instructions 

 

 

 

Display elements

 

 

Figure 5: Elements of the display

 

 

Item number

 

(See Figure 5.) 

Description

 

1

 

Application name. 

Lists the name of the displayed application. 

 

2

 

Application tile 1. 

3

 

Application tile 3. 

 

4

 

Status bar. 

The right side of the status bar lists instrument status such as the selected input, 

type of input signal, selected signal reference, video/reference signal status, audio channel 

status, the real time clock setting, and the message  center. 
The left side of the Status bar has icons with links to various instrument setting menus, presets, 

audio volume control, and status readouts. Use the Home icon to exit any displayed menus. 

5

 

Application tabs. 

Some applications have selectable tabs (highlighted readouts) you can use 

to display additional information. 

 

6

 

Application tile 4. 

7

 

Application tile 2. 

 

The application panels can be shown in four-tile mode or in full screen mode. 

Содержание PRISM MPX2-25

Страница 1: ...PRISM MPX2 25 Media Analysis Platform Installation and Safety Instructions 071 3738 00...

Страница 2: ...ation in this publication supersedes that in all previously published material Specifications and price change privileges reserved TELESTREAM is a registered trademark of Telestream LLC Contact Telest...

Страница 3: ...s for products returned to any other locations This warranty shall not apply to any defect failure or damage caused by improper use or improper or inadequate maintenance and care Telestream shall not...

Страница 4: ...irectly the program any associated documentation or the direct product thereof to any country to which such export or re export is restricted by law or regulation of the United States or any foreign g...

Страница 5: ...ns contained in the Program will meet Customer s requirements or that the operation of the Program will be uninterrupted or error free TELESTREAM AND ITS VENDORS DISCLAIM ANY IMPLIED WARRANTIES OF MER...

Страница 6: ...tion vii Preface xiv Installation 1 Initial product inspection 1 Accessories 2 Operating requirements 4 Equipment rack installation 5 Rear panel connectors 6 SFP module installation 8 Power on and pow...

Страница 7: ...rical Equipment for Measurement Control and Laboratory Use Part 1 General Requirements Environmental Perchlorate Materials this product contains one or more type CR lithium batteries According to the...

Страница 8: ...2014 EN 61000 3 3 2013 Immunity EN 55103 2 2009 EN 61000 4 2 2009 EN 61000 4 3 2006 Al 2008 A2 2010 EN 61000 4 4 2004 Al 2010 EN 61000 4 5 2006 EN 61000 4 6 2009 EN 61000 4 11 2004 Environments E2 War...

Страница 9: ...urces and ensure that it is recycled in a manner that protects human health and the environment For more information about where you can drop off your waste for recycling please contact your local aut...

Страница 10: ...oduct it is essential that you follow generally accepted safety procedures in addition to the safety precautions specified in this manual The product is designed to be used by trained personnel only O...

Страница 11: ...rates incorrectly If in doubt about safety of the product turn it off and disconnect the power cord Clearly mark the product to prevent its further operation Before use inspect voltage probes test lea...

Страница 12: ...ry hazard immediately accessible as you read the marking WARNING indicates an injury hazard not immediately accessible as you read the marking CAUTION indicates a hazard to property including the prod...

Страница 13: ...that the mains supply voltage fluctuations do not exceed 10 of the operating voltage range WARNING In the instrument only the line conductor is fused for over current protection The fuse is internal...

Страница 14: ...trument within a 1RU full rack width platform Extensive IP monitoring solution for SMPTE 2022 6 2110 PTP and RTP streams Graphical displays that show the traffic present in the 10 25G Ethernet link al...

Страница 15: ...bes the new features improvements and limitations of the instrument firmware Rackmount Field Install Describes how to install the Slides and Instructions instrument in a 19 equipment rack Rails Instal...

Страница 16: ......

Страница 17: ...duct options you ordered are installed a After you install and power on the instrument touch or click the Settings icon b Touch or click the Utilities bar c Touch or click the Options bar d The displa...

Страница 18: ...ial connector MP SFP Opt 3GTH 10G Ethernet short range 850 nm transceiver module to be installed into SFP cage MP SFP Opt 10GESR 10G Ethernet long range 1310 nm transceiver module to be installed into...

Страница 19: ...a power cord Opt A1 Universal EUR power cord Opt A2 United Kingdom power cord Opt A3 Australia power cord Opt A4 240 V North America power cord Opt A5 Switzerland power cord Opt A6 Japan power cord Op...

Страница 20: ...Altitude Operating To 3 000 m 10 000 feet Maximum operating temperature decreases 1 C each 300 m above 1 5 km Non Operating To 12 000 m 40 000 feet Cooling Internal fans provide forced air circulatio...

Страница 21: ...1 Typical power 100 W WARNING In the instrument only the line conductor is fused for over current protection The fuse is internal and not user replaceable Do not attempt to replace the fuse If you sus...

Страница 22: ...GE or SDI I O Two SFP module slots that can be configured for SDI or IPapplications 10 25GE Two optional SFP ports for 10 25GbE Ethernet applications See MP SFP products for available modules SDI SFP...

Страница 23: ...se 15 Audio output 3 5 mm line out port for using headphones to listen to the selected audio channel pair 16 Mic input This connector is for future use 17 USB ports Four USB 3 0 ports for connecting a...

Страница 24: ...fully inserted Figure 2 Installing and removing an optical SFP module To remove the SFP module pull down on the latch and then pull the module out of the SFP connector as shown above optical SFP modul...

Страница 25: ...ear panel of the instrument as shown The power connector is keyed to be directional with the flat portion of the power cord housing facing the left of the instrument as viewed from the rear When fully...

Страница 26: ...power on sequence and then turns off during normal instrument operation Power off procedure 1 Press the Power Standby button on the instrument front panel to turn the instrument off CAUTION To prevent...

Страница 27: ...sing the PRESET or INPUT button press one of the SELECTIONS buttons 1 6 to recall an instrument preset or to select an input to monitor 5 VOLUME control Turn the VOLUME control to adjust the volume on...

Страница 28: ...al selected signal reference video reference signal status audio channel status the real time clock setting and the message center The left side of the Status bar has icons with links to various instr...

Страница 29: ...resets Select an input to monitor Control or mute the volume on the headphone outputs Connect a mouse and keyboard Connect a USB drive to import or export instrument presets upgrade the instrument fir...

Страница 30: ...tile mode Supported touchscreen gestures You can use the touchscreen gestures to control the instrument Touch or tap the screen to select display elements Press and hold on a tile to open the applicat...

Страница 31: ...p the icon to clear or reset the selected display Remote control through VNC operation When the PRISM monitor is connected to an Ethernet network you can use a computer connected to the same network t...

Страница 32: ...and Safety Instructions 2 A login web page is shown 3 In the Control bar click the Settings icon to open the Settings dialog 4 In the Settings dialog use the Scaling Mode drop down list to select Loca...

Страница 33: ...log enter the default password PRISM and then click Connect NOTE You can use the WEB REMOTE tab of the PRISM Settings Network menu to change the default password for the remote web connection 7 The we...

Отзывы: