LTX Patch and Splice Panel

LTX Patch and Splice Panel

Fiber :: Install guide

Refer to 

Figure 4-7

 for this procedure.

Fiber jumpers enter the LTX Patch and Splice Panel from front corners and attach to adapters following the number scheme designated on the 
designation label mounted on the front door.  

After connectors with pigtail fi bers have been installed and fi bers have been spliced:

1. 

Locate adapter designation number on the designation card located on the front door of the LTX panel. Record designation information. 

2. 

Remove protective dust cap from the patch plate adapter port for the fi ber jumper being installed.

 

NOTE: To protect fi bers, work with one fi ber jumper at a time. Only remove the dust cap for the fi ber jumper being installed.

3. 

Clean adapter port with oil free "canned" compressed air to remove any dust that has accummulated there.

4. 

Remove the protective cover from the fi ber jumper by pulling it straight out.

5. 

Inspect the end of the fi ber jumper for any dust or debris. If needed, clean the fi ber with lint wipes and a commercial solution formulated 
for cleaning fi ber surfaces or a reagent-grade ethyl alcohol to remove particles.

6. 

Use a second dry wipe to dry the fi ber.

7. 

Inspect again to ensure fi ber end is clean; repeat Steps 5 - 6 if needed.

 

NOTE:  After confi rming the fi ber jumper end is clean, do not wipe the fi ber or allow it to touch anything before installing it in the 
adapter.

8. 

Insert the clean, dry fi ber into the adapter port.

9. 

Repeat Steps 1 - 8 to install remaining fi ber jumpers to adapters in the patch plate.

Figure 4-7 - Connect Fiber Jumpers to the Patch Panel

LTX  Panel

Top View 

Front

LTX Panel

Top View

Rear (partial)

Designation 

Card

Front

Door

Patch Plate 

Adapter Ports

Содержание LTX

Страница 1: ...LTX LTX Patch and Splice Panel Patch and Splice Panel ...

Страница 2: ... Telect Inc All rights reserved 148326 09 08 16 v2 1 509 926 6000 telect com 2 LTX Patch and Splice Panel LTX Patch and Splice Panel Fiber Install guide This page intentionally left blank ...

Страница 3: ...ber Holder 13 3 1 8 Install Adapter Patch Plate 14 3 1 9 Install Panel Doors 14 3 1 10 Install Designation Labels 15 3 1 11 Install Mounting Brackets to the LTX Panel 15 3 2 Install and Ground the LTX Panel to the Rack 16 4 LTX Patch and Splice Panel Cable and Fiber Installation and Routing 17 4 1 Cable Installation and Routing 17 4 1 1 IFC Cable Installation and Routing 17 4 1 2 Install IFC in th...

Страница 4: ... Install Cable Clamp 13 Figure 3 7 Central Stength Member Holder Installation 13 Figure 3 8 Install Adapter Patch Plate 14 Figure 3 9 Door Installation 14 Figure 3 10 Install Designation Labels 15 Figure 3 11 Install Mounting Brackets on LTX Panel 15 Figure 3 12 Install and Ground LTX Panel to the Rack 16 Figure 4 1 Secure IFC Cabling to the LTX Panel 17 Figure 4 2 Route Protected 2 Strand Ribbon ...

Страница 5: ...gure 1 1 LTX Patch and Splice Panel with SC Adapters Dimensions and Weights Dimensions 7 H x 17 W x 17 D Weight 12 lbs Mechanical Connector type SC UPC SC APC LC APC LC UPC MPO MTP Access Front and Rear Capacity 288 port 4RU Splicing Mass Fusion Stranded Panel mounting 19 or 23 with ETSI EIA or WECO spacing Adapter access Patch Panel Material Aluminum Steel Compliance NEBS ETSI Zone 4 Seismic reli...

Страница 6: ...NG Indicates a potentially hazardous situation which if not avoided could result in death or serious injury Telect assumes no liability from the application or use of these products Neither does Telect convey any license under its patent rights of others This document and the products described herein are subject to change without notice 1 2 About this Guide 1 3 Terminology Acronym Abbreviation Te...

Страница 7: ...ber jumpers connect to adapters at the front LTX Patch and Splice Panel patch plates can accommodate SC UPC SC APC LC APC LC UPC are available in patch plates with 6 or 8 adapters LC SC available in patch plates with 12 adapters LC UPC and LC APC available in patch plates with 24 adapters MPO MTP feed through patch plates available with 6 or 8 adapters In addition Telect offers a special factory c...

Страница 8: ... Telect Inc All rights reserved 148326 09 08 16 v2 1 509 926 6000 telect com 8 LTX Patch and Splice Panel LTX Patch and Splice Panel Fiber Install guide This page intentionally left blank ...

Страница 9: ...ion such as Underwriter s Laboratories UL TUV etc ALERT Do not stand on fiber or fiber cables CAUTION These instructions presume you have verified that the Telect equipment being installed is compatible with the rest of the system including power ground circuit protection signal characteristics equipment from other vendors and local codes or ordinances When you receive the equipment carefully unpa...

Страница 10: ...mum ambient temperature Tma specified by the manufacturer Mechanical Loading Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to uneven mechanical loading Reliable Earthing Reliable earthing of rack mounted equipment should be maintained Particular attention should be given to supply connections other than direct connections to the branch circuit ...

Страница 11: ...ith routing spools velcro banding and stacked splice trays one or two cable clamp brackets with cable clamps front and rear doors designation cards for front and rear of the panel and an adapter patch plate panel with connectors and adapters LTX Patch and Splice Panel Side View Arc Arc Center Groove Arc Front View Arc Arc Door Door 3 1 2 Install Routing Spools Refer to Figure 3 2 for this procedur...

Страница 12: ... to secure the trays to the platform 3 1 4 Install Tray Platform Refer to Figure 3 4 for this procedure The tray platform sits in the bottom center of the rear portion of the LTX panel The platform contains routing spools tray banding tie down slots and splice trays The tray platform can be rotated out from inside the LTX panel or can be removed for splicing 1 Position the tray platform on the bot...

Страница 13: ...e inside of the cable clamp and remove enough bushing leaves so that the rubber cable clamp halves and remaining bushing leaves will fit snugly around the cable 3 Position cable clamp so that screw holes align in both clamp halves and the cable clamp bracket 4 Insert the two clamp screws to secure the clamp on the cable clamp bracket The bracket allows for some adjustment of the clamp as needed 5 ...

Страница 14: ... Install Adapter Patch Plate Refer to Figure 3 8 for this procedure The Adapter Patch Plate installs at the front of the LTX Patch and Splice Panel The patch plate comes with adapters pre installed Pigtail fibers from the splice tray willl connect to connectors at the rear and fiber jumpers will connect to adapters at the front of the patch plate 1 Position the patch plate at the front of the LTX ...

Страница 15: ... pigtail fiber connector side is marked REAR SIDE on the bottom corner NOTE After installing both designation labels ensure they are installed on the correct side of the LTX panel Figure 3 10 Install Designation Labels LTX Panel Clear Cover for Designation Label Door Refer to Figure 3 11 for this procedure The LTX panel mounting brackets are used to attach the LTX panel to a 19 or 23 EIA ETSI or W...

Страница 16: ...ce panels adapt to standard 19 and 23 standard EIA ETSI or WECO racks 1 Position LTX Panel mounting bracket between rack panels aligning screw holes so that panel is in desired position 2 Insert four 12 24 thread forming screws supplied two on each side to secure the panel to the rack 3 If needed include a ground lug and star washer one ground lug with 14 AWG stranded wire per chassis 4 Tighten sc...

Страница 17: ...ays cables are clamped and unprotected fiber ribbons are measured out and routed through the splice tray to splice sleeve holders At the rear of the LTX panel pigtail fiber strands route from connectors that attach to adapters with fiber jumpers at the front of the LTX panel The pigtail fibers route into the splice tray at the corner opposite to where the incoming IFC ribbon fibers route into the ...

Страница 18: ...sure the diameter of the incoming IFC 2 If needed remove and discard leaves from the center of the cable clamp until the correct dimension the diameter of the IFC is obtained 3 Clamp remaining bushing halves of the cable clamp around the IFC The two rubber bushings fit the IFC riser plenum cable 4 1 2 Install IFC in the Cable Clamp Figure 4 1 Secure IFC Cabling to the LTX Panel IFC installs into c...

Страница 19: ...ded band fibers together with velcro ties at protective tabs NOTE Take care to maintain a bend radius of no less than 7 inches as the fibers route through the tray 7 Continue to route the fibers to one of the bottom sleeve holders Place six individual fibers in individual grooved sleeves in the sleeve holder Fiber should not run all the way through the sleeve holder but should stop about halfway i...

Страница 20: ...n connector with attached pigtail fiber at designated connector location and run pigtail fiber to the splice tray 3 Proceed to Section 4 1 6 Route Pigtail FIbers in the Splice Tray before installing the next pigtail fiber connector NOTE Each splice tray contains sleeve holder slots for 36 pigtail fibers Figure 4 5 Route Pigtail Fibers from Connectors Connector Locations Connect Pigtail Fibers Rout...

Страница 21: ... individual pigtail fiber through the tray maintaining a bend radius of no less than 7 inches Keep the fiber beneath the protective tabs along the edge of the splice tray 3 Route the fiber through the tray around the sleeve holder position and into the corresponding sleeve holder about halfway so that fiber ends do not touch the IF fibers 4 For each fiber routed into the tray repeat this section u...

Страница 22: ...e they are free of gel lint and debris b Splice fibers according to mass fusion splice machine manufacturer instructions c After splicing inspect splice for flaws If needed cut and re splice before adding splice sleeve 7 Re route the two spliced ribbons back in the splice tray to the splice sleeve holder in the same order as originally placed Refer to Section 4 1 4 Install Ribbon Fibers in the Spl...

Страница 23: ...e fiber jumper being installed 3 Clean adapter port with oil free canned compressed air to remove any dust that has accummulated there 4 Remove the protective cover from the fiber jumper by pulling it straight out 5 Inspect the end of the fiber jumper for any dust or debris If needed clean the fiber with lint wipes and a commercial solution formulated for cleaning fiber surfaces or a reagent grade...

Страница 24: ...ctors and adapters Telect recommends a commercially available system or solution Special formulation for cleaning fiber ferrules allows the commercial solvent to stay liquid long enough to dissolve impurities quickly and thoroughly yet evaporate quickly after wiping dry Always allow the ferrules to air dry thoroughly before reconnecting Canned air can be used to clean away debris initially but do ...

Страница 25: ...owever Telect charges a processing fee You must submit a Purchase Order along with a Return Material Authorization RMA before returning equipment Call Telect for assistance in acquiring these forms The processing fee guarantees a repair estimate and is credited against actual material and labor costs Tag the equipment showing owner s name address and telephone number together with a detailed descr...

Страница 26: ... Telect Inc All rights reserved 148326 09 08 16 v2 1 509 926 6000 telect com 26 LTX Patch and Splice Panel LTX Patch and Splice Panel Fiber Install guide This page intentionally left blank ...

Отзывы: