The choke operates at 1 and the 3 rd attempt 
to start and has a response time of 2 sec. 
If you want to vary the operating time of 
action as in Fig. 39 - 40 - 41. 
The adjustment can vary from 1 to 3 seconds

 

 

 

 

 
 
8   ROUTINE MAINTENANCE SCHEDULE 

 

ROUTINE MAINTENANCE SCHEDULE 

To be performed after the period of time or the number 
of running hours listed here, whichever the earlier

.

 

Every 

use

 

First 

Month 

or 

20 hours

Every 

3 Months 

or 

50 hours

 

Every 

6 Months

or 

100 hrs

 

Every 

12 Mths

or 

300 hrs

 

Level check 

 

 

 

 

 

Engine Oil 

Replacement  

 (2) 

 (2) 

 

 

Air Filter 

Clean and replace if necessary 

 

(1)

(2) 

 

 

 

Fuel Filter and 
Tank 

Clean and replace if necessary 

 

 

 

 

 (2) 

Spark plug 

Clean and replace if necessary 

 

 

 (2) 

 

 

Valve 
Adjustment 

Check - Adjust 

 

 

 

 

 (2) 

Fuel Pipe 

Check for leaks or cracks 

 

 

 

 

 (2) 

Check for leaks or cracks 

 

 

 

 

 (2) 

Muffler 

Clean and replace spark 
screen if necessary 

 

 (2) 

 

 (2) 

 

Air Choke Valve  Check correct operation 

 

 

 

 (2) 

 

Engine rpm or 
Frequency 

Check - Adjust 

 

 

 

 (2) 

 

Vibration 
Damper 
Suspension 
Points 

Check – Replace if necessary 

 

 

 

 

 (2) 

Содержание Energy 2510G

Страница 1: ...Energy 2500 G Vers 022 1 GB INDEX USER S OPERATING INSTRUCTION AND INSTALLATION MANUAL GB ENERGY 2510G v 001 February 2011 GENERATORS...

Страница 2: ...Electronic control panel connection 12 4 8 ElectricSystem fuses 12 4 9 FASTENING the pressure reducer 12 4 10 Battery charger 13 4 11 Auxiliary Battery Charger 13 4 12 Connecting an additional silence...

Страница 3: ...9 PROLONGED INACTIVITY 25 10 DISMANTLING 25 11 RECOMMENDED FIRE FIGHTING EQUIPMENT 25 GENERAL WARRANTY TERMS 26 WIRING DIAGRAM ENERGY 2510 G 27 DRAWING FOR SPARE PARTS LIST ENERGY 2510 G 29 When usin...

Страница 4: ...ty and health requirements laid down by the European Directive on Machine Safety This statement shall no longer be valid if any changes are introduced in the machine without our written approval Machi...

Страница 5: ...ng term performance and reliability of the generator set and the prevention of injury and or damage Note The information contained in this publication was correct at the time it went to print but may...

Страница 6: ...panel 9 Gas pipe and cable outlet block 10 Sliding surface locking screw 11 Fuel pipe 12 Sliding surface all out locking screw 2 2 Identification plate Fig 2 1 Generating set model 2 Model code numbe...

Страница 7: ...inuous power kW 2 2 Voltage Frequency V Hz 230 50 Continuous current output A Vdc 10 12 Rotor insulation class H Stator insulation class F Cooling Centrifugal fan GENERATOR 2510 G Overall weight kg 60...

Страница 8: ...y or damage to people or property Installation must be performed by qualified and adequately trained personnel only 4 2 Instructions for fastening the generating set The ENERGY 2510 G generating sets...

Страница 9: ...pose of preventing hot air from spreading inside the generator compartment The brackets of the generator must be moved in order to fasten the Energy 2510 G on the bearing surface On both sides remove...

Страница 10: ...in Table 1 To this end the generating set is provided with two special terminals Fig 13 Ref 2 used to connect the positive and negative poles of the battery Connect the cable of the positive pole red...

Страница 11: ...be connected Use the special cable outlet Fig 11 Ref 1 to prevent water seeping into the generating set Although the generating set is equipped with a special internal thermal cut out to cut power de...

Страница 12: ...o the auxiliary battery charger optional From the bipolar connector Fig 13 Ref 6 it is possible to derive supply for an RCB battery charge regulator via two 4 mm2 cables also see paragraph 4 11 1 4 7...

Страница 13: ...ring 8 by means of a wrench and tighten the ring nut 9 When using the generator in cold environments please remember that the lower the temperature down to a temperature limit of 15 C the higher the p...

Страница 14: ...ncer kit code 02482 consists of A silencer code 02019 Fig 21 Ref 1 A one metre long section of flexible steel tubing code 00433 Fig 21 Ref 2 Two connection fastening clamps code 00543 Fig 21 Ref 3 One...

Страница 15: ...the coupling code 03645 Fig 24 Ref 2 into the muffler terminal Fig 24 Ref 1 drill a small hole in the muffler terminal large enough to accept a self tapping screw to lock the muffler terminal Fig 25...

Страница 16: ...ect the two wires of the 230 V line of the generating set to the PINS 1 3 Connect the user line to the PINS 7 9 Connect the outside line to the PINS 6 4 Jumper the PINS 4 A Jumper the PINS 6 B Connect...

Страница 17: ...e the engine is running Never touch the generating sets or the wiring connections with wet hands Never replace the fuses or the cut out switches with others having higher amperage Should any electrica...

Страница 18: ...ould never be disconnected as there would be no input to the electronic control panel which would prevent the generating set from working The generating set is provided with an internal combustion eng...

Страница 19: ...rm the red service light is flashing Cause 50 hours have elapsed since the latest engine oil change and oil level should be checked How to reset the alarm press the partial counter key Fig 30 Ref 9 an...

Страница 20: ...battery is charged and anyway after at least 15 minutes running the battery charged hours indicator Fig 32 Ref 11 will light up and the electronic control panel will turn off the generating set Settin...

Страница 21: ...the dipstick and filler cap back on and screw tightly Do not fill to exceed the maximum level as this could cause malfunctioning of the fuel pump and hence of the generating set All engine oil level c...

Страница 22: ...to special disposal centres carrying out disposal and or recycling in compliance with the applicable law provisions in force in the country of use 7 4 2 Air filter maintenance A clogged air filter wi...

Страница 23: ...good condition and then screw back on by hand to make sure that it is correctly put back in place Finally tighten to the right torque using the special wrench see instructions in the engine user and...

Страница 24: ...Every use First Month or 20 hours Every 3 Months or 50 hours Every 6 Months or 100 hrs Every 12 Mths or 300 hrs Level check Engine Oil Replacement 2 2 Air Filter Clean and replace if necessary 1 2 Fue...

Страница 25: ...emptied prior to a long period of non use do this by turning off the fuel tap and running the generator set until it stops It is also essential that you never use old unleaded petrol as it can undergo...

Страница 26: ...period shall end no later than 14 months 16 months if delivered outside of Europe after ex factory delivery In any case the costs of lubricants and consumables shall be charged Any transport expenses...

Страница 27: ...Vers 001 Energy 2510 G 27 GB WIRING DIAGRAM ENERGY 2510 G...

Страница 28: ...e protection fuse Pressure reducer GAS solenoid valve GAS Wiring Protection Fuse Battery charger terminal Pos 14 15 16 17 18 19 20 21 22 23 24 25 A Description Electronic control panel Electronic cont...

Страница 29: ...Vers 001 Energy 2510 G 29 GB DRAWING FOR SPARE PARTS LIST ENERGY 2510 G...

Страница 30: ...Energy 2510 G Vers 001 30 GB...

Страница 31: ...Vers 001 Energy 2510 G 31 GB...

Страница 32: ...en f r Haube Aislante Trasero Cap Isolante Destro Cofano Isolation Droite Capot Isolatie rechts voor kap 8 03905 N 1 Right hood insulation Isolierung rechts f r Haube Aislante Derecho Cap Isolante Sup...

Страница 33: ...7 N 1 Muffler end pipe Auspuff Endrohr Tubo de descarga Convogliatore marmitta Convoyeur pot d chappement Geleider knaldemper 23 01830 N 1 Muffler conveyor Auspufftopf Leitblech Transportador silencia...

Страница 34: ...gungsb gel 2009 Estribo de anclaje 2009 Pannello di controllo ENERGY Tableau contr le ENERGY Schakelpaneel ENERGY 40 03789 N 1 ENERGY control panel Bedienpanel ENERGY Panel de control ENERGY Cavo 5 mt...

Страница 35: ...53 03854 N 1 Control box Steuerbox Caja de Mando Cablaggio con scheda elettro nica C blage avec carte lectroni que Bedrading met elektronische kaart 54 05076 N 1 Wiring with electronic board Verkabelu...

Страница 36: ...ronne Moyeu avec bride Rotor wisselstroomdynamo Krans Naaf met flens 67 04243 N 1 Alternator rotor Crown Hub with flange Rotor der Lichtmaschine Na be mit Flansch Rotor alternador Corona Cubo con brid...

Страница 37: ...admission GAZ GAS inlaatkoppeling 82 05570 N 1 GAS input fitting Anschlusss Eingang GAS Conexi n entrada GAS Rondella in alluminio Rondelle en aluminium Onderlegring van aluminium 84 00931 N 1 Alumini...

Страница 38: ...reduzierer Reductor Presi n GAS Riduttore Pressione GAS completo Manod tendeur GAZ compl te GAS drukregelaar compleet 96 05080 N 1 GAS pressure reducer com plete GAS Druckreduzierer kom plett Reductor...

Страница 39: ...Vers 001 Energy 2510 G 39 GB...

Страница 40: ......

Отзывы: