Quick Start Guide
Quick Start Guide
Quick Start Guide
Quick Start Guide
Quick Start Guide
Quick Start Guide
796 Tek Drive, Crystal Lake, IL 60014 USA
+1 847 857 6076 | +1 847 655 7428
+1 847 655 6147
www.tek-trol.com
1. Before You Begin
2. Unpack
Tek-Clamp 1200A Ultrasonic Clamp-On Flowmeter
Make sure the transmitter is installed by qualified personnel and in accordance with the applicable code
of practice.
Disconnect the power before servicing, to prevent ignition of flammable or combustible atmospheres.
Turn off the main power source to the Tek-Clamp 1200A and ensure lines to any other external power
sources are disconnected, or not powered while wiring the flowmeter.
3. Dimensional Drawing
(0.65 ft)
(ø0.002 ft)
9.88"
3.77"
8.26"
6.69"
7.48"
0.035"
(0.82
ft
)
(0.55 ft)
(0.68 ft)
(0.31 ft)
(0.95
ft
)
11.41
"