VOT1; Rev 1.5; EN; 5.11.2015
TKT66
– Installation and maintenance
25
“Mode” link closed
Maintained emergency luminaire circuit (exit luminaire)
“Mode” link closed
Maintained emergency luminaire circuit (when using Local Controllers)
Or, while connecting Local Controllers and/or K-model maintained or
non-maintained emergency luminaires to a same circuit.
Or, while connecting maintained luminaires without Control function
and K model luminaires to a same circuit
“Mode” link open
Non-maintained emergency luminaire circuit
As factory setting, all circuits are connected as maintained (exit luminaire or Local Controller). If you
wish to change into non-maintained emergency luminaire circuits, the "Mode" link needs to be removed
from those circuits.
Layout for “Mode” links is in next chapter.
NOTE! If you have control type luminaires (model type ends with letter K) or address modules with
maintained/non-maintained selection, all mode links can be closed. Luminaire will be selected
maintained or non-maintained with DIP
–switch. See further information from luminaire’s operation
manual.
5. Connect the alarms and the remote control switch into the connectors shown in
APPENDIX 4
and
APPENDIX 5
.
6. Set the system date on time so that the automatic tests can take place when scheduled (factory
setting at 00.00 o’clock)
Содержание TKT66
Страница 40: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 40 TKT66 P...
Страница 43: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 43...
Страница 44: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 44...
Страница 45: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 45...
Страница 46: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 46...
Страница 47: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 47...
Страница 48: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 48...
Страница 49: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 49...
Страница 50: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 50...
Страница 51: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 51...
Страница 52: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 52 APPENDIX 5 Circuit diagram with 3 phase input...
Страница 53: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 53...
Страница 54: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 54...
Страница 55: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 55...
Страница 56: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 56...
Страница 57: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 57...
Страница 58: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 58...
Страница 59: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 59...
Страница 60: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 60...
Страница 61: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 61...