VOT1; Rev 1.5; EN; 5.11.2015
TKT66
– Installation and maintenance
39
The condition of the fuses is monitored in real-time on mains operation. Blown fuses can be detected if
there is any load on the circuit. Empty circuits are not inspected.
NOTE! Only maintained circuits can be monitored in real-time (MODE closed). An internal error alarm
on a fuse error will be given as soon as the error is detected. The error information will be automatically
reset when the fuse has been replaced with a new one.
The condition of the output circuits is checked only before the tests. The circuit voltages are checked at
this time with an open and closed output circuit. Empty circuits are not inspected in this case either. An
output circuit error results in an internal error alarm. In circuit monitoring the LEDs of the front panel and
in the report the corresponding circles show the strength of the current of the circuit. The stronger the
current of the circuit, the higher the LED column. The LED column grows higher starting from down to
upwards.
APPENDIX 2: Mechanical dimensions
TKT66:
Содержание TKT66
Страница 40: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 40 TKT66 P...
Страница 43: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 43...
Страница 44: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 44...
Страница 45: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 45...
Страница 46: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 46...
Страница 47: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 47...
Страница 48: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 48...
Страница 49: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 49...
Страница 50: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 50...
Страница 51: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 51...
Страница 52: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 52 APPENDIX 5 Circuit diagram with 3 phase input...
Страница 53: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 53...
Страница 54: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 54...
Страница 55: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 55...
Страница 56: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 56...
Страница 57: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 57...
Страница 58: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 58...
Страница 59: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 59...
Страница 60: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 60...
Страница 61: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 61...