background image

 

5 of 12 

 © 2010          D 132 - 04/10

CAUTION 

Improper installation and operation of this control could result in damage to the equipment and possibly even personal injury. It is 
your responsibility to ensure that this control is safely installed according to all applicable codes and standards. This electronic 
control is not intended for use as a primary limit control. Other controls that are intended and certified as safety limits must be 
placed into the control circuit. 

STEP ONE -------------------

 ------------------- GETTING READY --------------------------------------------------------------------------------------------------

 --------------------------------------------------------------------------------------------------  

Check the contents of this package. If any of the contents listed are missing or damaged, please contact your wholesaler or tekmar 
sales representative for assistance. 

 

Type 132 includes:  

One Pump Sequencer 132, Data Brochures D 132, D 001, Application Brochure A 132 

 

Note:

 Carefully read the details of the 

Sequence of Operation

 to ensure that you have chosen the proper control for your application. 

STEP TWO  ------------------

 ------------------ MOUNTING THE BASE ------------------------------------------------------------------------------------------

 ------------------------------------------------------------------------------------------  

Remove the control from its base by pressing down on the release clip in the wiring chamber and sliding the control away from it. 
The base is then mounted in accordance with the instructions in the Data Brochure D 001. 

STEP THREE  ---------------

 --------------- ROUGH-IN  WIRING   ----------------------------------------------------------------------------------------------

 ----------------------------------------------------------------------------------------------  

All electrical wiring terminates in the control base wiring chamber. The base has standard 7/8” (22 mm) knockouts which accept 
common wiring hardware and conduit fittings. Before removing the knockouts, check the wiring diagram and select those sections 
of the chamber with common voltages. Do not allow the wiring to cross between sections as the wires will interfere with safety 
dividers which should be installed at a later time. 

Power must not be applied to any of the wires during the rough-in wiring stage. 

If an Outdoor Sensor 070 is used, install the outdoor sensor according to the instructions in the Data Brochure D 070 and run 
the wiring back to the control. 

Run wire from other system components (pumps, alerts, etc.) to the control. 

Run wires from the 120 V (ac) power to the control. Use a clean power source to ensure proper operation. Multi-strand 16 AWG 
wire is recommended for all 120 V (ac) wiring due to its superior flexibility and ease of installation into the terminals. 

STEP FOUR -----------------

 ----------------- ELECTRICAL CONNECTIONS TO THE CONTROL  ----------------------------------------------------

 ----------------------------------------------------  

The installer should test to confirm that no voltage is present at any of the wires. Push the control into the base and slide it down 
until it snaps firmly into place. 

 


Powered Input Connections

 --------------------------------------------------

 

120 V (ac) Power 

Connect the 120 V (ac) power supply to the 

Power N

 and 

Power L

 terminals (11 and 12). 

This connection provides power to the microprocessor. 
 

Pump Demand 

To generate a pump demand, a voltage between 24 V (ac) and 240 V (ac) must be 
applied across the 

Pump Demand

 terminals (1 and 2). 

 

2-Stage Demand 

To generate a 2-stage demand, a voltage between 24 V (ac) and 240 V (ac) must be 
applied across the 

2-Stage Demand

 terminals (3 and 4). 

 

120 V (ac)

N

L

Power

11

12

1

2

Pum p

Demand

24 to 240 V (ac)

3

4

2-Sta ge

Demand

24 to 240 V (ac)

Installation

Содержание Pump Sequencer 132

Страница 1: ...ms Ltd Power Pump Relays Alert Relays Demands 120 V 10 60 Hz 6VA 240 V ac 10 A 1 2 hp pilot duty 720 VA 240 V ac 10 A 1 3 hp pilot duty 240 VA 20 to 260 V ac 2 VA Signal wiring must be rated at least...

Страница 2: ...econds then the control turns on all of the red LED s for 2 seconds After this test the control enters its normal operating mode When the control is powered up the Power light remains on continuously...

Страница 3: ...trol turns on the output for 10 seconds This minimizes the possibility of a pump seizing during a long period of inactivity Note The exercising function does not work if power to the control or pumps...

Страница 4: ...ts have two modes of operation The mode of operation for the alert contacts is selected using the Alert per Pump Alert Levels DIP switch When an alert contact is activated refer to the Error Messages...

Страница 5: ...check the wiring diagram and select those sections of the chamber with common voltages Do not allow the wiring to cross between sections as the wires will interfere with safety dividers which should b...

Страница 6: ...als 17 and 18 The outdoor sensor is used by the 132 to measure the outdoor air temperature Note If an outdoor sensor is not installed the WWSD dial must be set to Off STEP FIVE TESTING THE WIRING Each...

Страница 7: ...is off you should measure less than 5 V ac Test The Outputs Pump 1 and Pump 2 Make sure power to the terminal block is off and install a jumper between Pump 1 terminals 7 and 8 When the pump circuit...

Страница 8: ...to section A 30 second Delay 10 second Delay The 30 second Delay 10 second Delay DIP switch is used to select what time delay is required to prove flow once a pump contact is turned on Refer to sectio...

Страница 9: ...ter 10 seconds the Alert A contact is shut off Step 4 Alert B contact is turned on for 10 seconds After 10 seconds the Alert B contact is shut off ERROR HANDLING If an internal control fault occurs th...

Страница 10: ...or Short Control Internal Error Outdoor Sensor Open WWSD Off Flow Proof Signal Pump 1 Failed Pump 2 Failed Pump 1 and Pump 2 Failed Power WWSD 2 Stage Demand Flow Proof Pump Demand Power WWSD 2 Stage...

Страница 11: ...11 of 12 2010 D 132 04 10 Notes...

Страница 12: ...PTION OF THE PRODUCT ITS NON INFRINGEMENT OF ANY RELEVANT PATENTS OR TRADEMARKS AND ITS COMPLIANCE WITH OR NON VIOLATION OF ANY APPLICABLE ENVIRONMENTAL HEALTH OR SAFETY LEGISLATION THE TERM OF ANY OT...

Отзывы: