
5. Commissioning
WARNING
Dangers arising from a defective condition of the unit.
Make sure that the measures described in this chapter are completed before the
commissioning of the unit. All doors of the unit must be closed and all necessary connections
must be attached before turning the unit on. Do not operate the unit if any components are
defective, missing or damaged. Check the orderly condition of the unit before switching it on.
The unit must not be operated without a filter element.
NOTICE
Damaged supply lines.
Make sure that the supply lines are protected against damage by forklift trucks and similar
events. Protect all supply lines from heat, moisture, oil and sharp edges.
If the wet separator is equipped with a frequency converter, the setting of the correct volumetric
flow rate is part of the commissioning. It must be set in the control. Please refer to the instructions
in the separate operating manual of the control unit.
BA_Nassabscheider_WNA-AL_211118_EN
9
18.11.2021