3.2.4  Rotation Check (Teikoku Rotary Indicator TRC-1)

Centrifugal pump impellers must rotate in the proper direction to 
deliver rated head and capacity. The impeller must rotate in the 
same direction as the arrow cast on the pump casing.

Caution!

Pump and motor must be fully primed, vented, and liquid 
full prior to checking direction of rotation. 

The Type-L TRG Meter A45 C does not provide direction of rota-
tion. The Teikoku TRC-1 hand-held direction of rotation indicator 
is available from Teikoku USA. This portable device can be used to 
confirm the rotation of any motor. See 

Figure 3-1.

1.  Set VFD speed to 60 Hz.

2.  Verify suction valve is 100% open.

3.  Set discharge valve 10% to 20% open.

4.  Set start valve at 100% closed.

5.  Switch on the pump for 3 to 5 seconds.

6.  Check indication of TRC-1 hand-held rotation indicator. See 

Figure 3-1

.

7.  If direction of rotation is not correct, swap any two of the 

electrical supply leads and repeat rotation check.

8.  Once direction of rotation has been verified, stop the pump 

and leave it for several minutes.

9.  Once you have determined correct rotation, tag correctly 

connected main power leads, in accordance with motor lead 
markings.

Attention!

It is recommended that the unit be run as little as possible 
with a closed discharge valve in order to prevent excessive 
overheating of the liquid circulating within the unit.

3.3  Starting Procedure

Caution!

Do not start or operate pump unless fully primed and  
liquid full.

Caution!

Do not continuously cavitate the pump.

Attention!

The pump should not be allowed to run for more than one 
minute with the discharge valve fully closed.

Attention!

Wait a minimum of 10 minutes between starts.

After priming, venting, and checking the direction of rotation, put 
the pump in operation as follows:

1.  Set VFD speed to required Hz for desired differential pressure. 

For differential pressure vs speed see

 Appx. G

 and 

Appx. H.

2.  Set the valve in the suction line to 100% open.

3.  Set the valve in the discharge line to 100% open.

4.  Set the start vent valve to 100% closed. When a solenoid 

valve is used for the start vent verify that the solenoid valve 
is open when the pump is off line and closed when pump is 
in operation.

5.  Start the pump. Pump should operate with very low noise and 

vibrations. Excessive or abnormal noise or vibrations should 
be corrected immediately.

6.  Adjust VFD speed as required to achieve specified flow rate.

7.  Once pump is operational, check the reading of the TRG me-

ter. Record initial reading for comparison to future readings. 
Check indication of TRG meter. See 

Table 2-1

8.  During any start up sequence, caution must be exercised not 

to exceed full load ampere rating indicated on the nameplate.

9.  If the unit has not been run for a period of two weeks or 

more, the following inspections should precede its operation:

A.  Check terminal box for moisture.
B.  Upon starting, check for excessive noise, vibration, erratic 

speeds or excessive amp draw.

Caution!

If the pump appears to be air bound as a result of the unit 
not being properly primed, do not continue operation. Lo-
cate and correct the conditions that prevent proper prim-
ing before attempting to start the unit.

Figure 3-1. Teikoku Rotary Indicator TRC-1

Содержание ALP 0104QM

Страница 1: ...NSTRUCTION MANUAL for Installation Operation and Maintenance HE 12270 December 2019 ALPTM ADVANCED LOW PROBABILITY AMMONIA TRANSFER PUMP TYPE F Plan 1 SD 0104QM Multi Stage Pressurized Circulation Pum...

Страница 2: ...F Plan 1 SD pressurized circulation ALP multi stage pump conforms to the following standards 1 Japanese Industrial Standard JIS 2 Japan Electrical Manufacturers Standard JEM 3 American Society of Mec...

Страница 3: ...e or liquid is present You must take measures if the possibility exists that the gas or liquid is toxic or hazardous to personnel or the environment Hazard Do not remove any bolts on pump motor or dra...

Страница 4: ...nel 35 Appx P Decontamination Form 36 Appx Q Teikoku Pump Repair Policy 39 Figures Figure 1 1 Type F Plan 1 SD Pressurized Circulation ALP Multi stage Pump 6 Figure 1 2 Flow Path 7 Figure 1 3 Typical...

Страница 5: ...nonymous with all Teikoku pump solutions Driven by any commercially available variable frequency drive VFD Type F Plan 1 SD pressurized circulation ALP multi stage pumps feature advanced hydraulics fo...

Страница 6: ...ed above its vapor pressure to assure required motor cooling and the estab lishment of the bearing liquid film for rotating element support The flow path of the Type F Plan 1 SD pressurized circulatio...

Страница 7: ...ti stage pump are carbon graphite as standard and are machined with special helix grooves through the bore to assure adequate liquid circulation at the journal area Each liquid film journal bearing is...

Страница 8: ...219 8 Figure 1 3 Typical NH3 Transfer System Requirements HIGH LEVEL LOW LEVEL ISOLATION VALVE ISOLATION VALVE CHECK VALVE CANNED MOTOR PUMP PLAN 1 SD PRESSURE GAUGES DISCHARGE VENT TO SAFETY START VE...

Страница 9: ...insufficient NPSH The suction line must have as few pressure drops as possible and available NPSH MUST be greater than required NPSH Depending on job conditions available NPSH can sometimes be increa...

Страница 10: ...TRG Bearing Wear Monitor The TRG is an electrical meter that continuously monitors the con dition of the bearings The TRG is mounted on the electrical junc tion box as standard The TRG meter operates...

Страница 11: ...ds or less Upper Limited Frequency 120Hz 120Hz Lower Limited Frequency 60Hz or Start Hz 60Hz or Start Hz Starting Frequency See note See note V F Control Variable Torque Variable Torque PWM Carrier Fr...

Страница 12: ...g current times 1 25 Attention Do not set the thermal overload protective device at more than the full load amps FLA listed on the name tag 3 2 2 Setting of Overload Relay Because of the rated electri...

Страница 13: ...continuously cavitate the pump Attention The pump should not be allowed to run for more than one minute with the discharge valve fully closed Attention Wait a minimum of 10 minutes between starts Aft...

Страница 14: ...ome cases the liquid supply may contain an excessive amount of air or gas which will tend to separate from the liquid and re main in the passages of the pump This results in the pump losing its prime...

Страница 15: ...lation pipe bolting Remove circulation pipe ori fice plate and gaskets 9 Remove front support foot 10 Remove casing bolts and slide casing off Be careful not to al low the casing to bind to or drop on...

Страница 16: ...neral ap pearance and uniform wear Excessive undercutting pitting or scoring is cause for replace ment Check the following points 1 Corrosion 2 Contact marks and wear 4 3 3 Rotor Assembly Inspection T...

Страница 17: ...ng housing onto the rotor shaft and slide the rear bearing hous ing and rotor into the stator Tighten bolting evenly using a star or cross pattern Torque bolts per Table 4 5 14 Slide front bearing hou...

Страница 18: ...2 Install pipe casing gasket Install pipe casing Install cap screws Tighten bolting evenly using a star or cross pattern Torque bolting per Table 4 5 33 Install o ring on diffuser plate 34 Install cas...

Страница 19: ...Play Motor Frame Number End Play Inch mm 216 217 0 043 0 067 1 1 1 7 316 See Figure 4 5 4 5 Service Policy Any Teikoku USA product damaged or inoperative for any rea son can be repaired at the Teikok...

Страница 20: ...Information Sheet 26 Appx G NH3 Reference Curve 20 F 27 Appx H NH3 Reference Curve 50 F 28 Appx I Type 217 120 Motor Data Sheet 29 Appx J 1 SD Temperature Pressure Profile 30 Appx K Optional Rotor Ca...

Страница 21: ...ure NA UTILITIES REQUIRED Water Jacket Fluid NA Flow NA Pressure NA Temperature NA Heat Exchanger Fluid NA Flow NA Pressure NA Terminal Box Connection Diag DRAWINGS Perf Curve Cross Section Outline 46...

Страница 22: ...Teikoku USA Chempump Instruction Manual HE 12270 0219 22 Containment Reliablity Safety by Design CHEMPUMP TEIKOKU USA INC Appx B Outline F 210P 0104Q 1 SD...

Страница 23: ...Shaft Sleeve 18A Thrust Collar 18B Thrust Collar 19 Rotor Assembly 20 Stator Assembly 21 Rotor Can 22 Stator Can 24 Terminal Box Ass y 32 F B Housing 34 Circulation Pipe 39A Stand Asesmbly 40 Base 41...

Страница 24: ...pe to the vapor zone in the suction tank c Never install a check valve in the vent pipe d The vent pipe must be continuously rising to the suction tank e This line must never be down slope at any poin...

Страница 25: ...er Wrong direction of rotation Reverse any two motor leads Damaged impeller Impeller must be repaired or replaced Pump loses prime after starting Pump not properly primed at starting Reprime pump in a...

Страница 26: ...e takes the guesswork out of confirming the correct rotation of the motor It is light compact and easy to use Not only can this be used on Teikoku canned motors but other three phase induction motors...

Страница 27: ...0 A S G 0 65 Vis 0 18 cp Aqueous NH3 Estimated Performance Curve 20 F 120 Hz 100 Hz 80 Hz 60 Hz 0 2 4 6 8 10 12 Input Power kW 120 Hz 100 Hz 80 Hz 60 Hz 0 1 2 3 4 5 0 5 10 15 20 25 30 35 40 NPSHr ft...

Страница 28: ...0 A S G 0 70 Vis 0 31 cp Estimated Performance Curve 50 F Aqueous NH3 REV Date Description APPROVED BY CHEKED BY DRAWN BY TEIKOKU USA INC 120 Hz 100 Hz 80 Hz 60 Hz 0 2 4 6 8 10 12 Input Power kW 120 H...

Страница 29: ...150 kW 0 0 2 0 4 1 6 1 8 1 10 1 12 2 Current A 5 9 8 0 11 0 14 8 21 0 26 4 Input kW 1 64 3 72 5 90 8 24 10 83 14 04 Power Factor 42 4 71 0 81 5 84 9 84 8 80 8 Efficiency 0 0 54 5 68 6 73 7 74 8 72 1...

Страница 30: ...ria 0 0 0 0 0 0 Judgement Good Good Good Good Good Good Higher flow and speeds and lower temperatures will increase NH3 Pressure Margins Maximum flow rate at minimum frequency for Anhydrous Ammonia 20...

Страница 31: ...Teikoku USA Chempump Instruction Manual HE 12270 0219 31 Appx K Optional Rotor Cavity Thermowell Containment Reliablity Safety by Design CHEMPUMP TEIKOKU USA INC...

Страница 32: ...Teikoku USA Chempump Instruction Manual HE 12270 0219 32 A B C Containment Reliablity Safety by Design CHEMPUMP TEIKOKU USA INC 5 of 13 Appx L Terminal Box Assembly...

Страница 33: ...Teikoku USA Chempump Instruction Manual HE 12270 0219 33 Containment Reliablity Safety by Design CHEMPUMP TEIKOKU USA INC Appx M Allowable Piping Forces and Moments...

Страница 34: ...Teikoku USA Chempump Instruction Manual HE 12270 0219 34 Appx N Optional TSG NH3 Speed Control Panel...

Страница 35: ...POSITIVE VOLTAGE BLK BLACK WIRE VDC COMMON VOLTAGE ALL FIELD WIRING TO BE 14 AWG UNLESS OTHERWISE SPECIFIED CONSULT MANUFACTURER S WIRING RECOMMENDATION FOR TYPE SIZE AND TERMINATION REQUIREMENT AS R...

Страница 36: ...p has been flushed by following steps A through Both the complete pump and the stator assembly have A3 of the Teikoku USA Flushing Procedure on page 2 of been flushed by following steps A through B3 o...

Страница 37: ...REWOUND B1 REMOVE THE RELIEF VALVE INSERT A SCREWDRIVER INTO THE RELIEF VALVE ADAPTER AND PRY THE LISK FILTER TO ONE SIDE REMOVE THE CONNECTION BOX FROM THE LEAD NIPPLE AND CHIP AWAY THE POTTING COMPO...

Страница 38: ...E COVER AND THE TERMINAL PLATE D2 WHEN PROCESS FLUID IS IN STATOR WINDING SUPPLY FLUSHING FLUID TO THE OPENING FOR SUFFICIENT TIME TO FULLY NEUTRALIZE THE PROCESS FLUID AFTER WASHING IS COMPLETED DRAI...