background image

Page 6

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

PA R T   I I   –   S A F E T Y

THE  MTU AND  CT

s

  OF  THE  TED  PRO  COMMERCIAL  sYsTEM  MUsT  BE 

INsTALLED BY A LICENsED ELECTRICIAN

This manual provides the steps necessary to safely install the MTU and Current Transformers (CTs).  
For detailed installation and operation of other components and software, please find it on the TED 
website:    

www.theenergydetective.com

Every effort has been made in providing for the safe, secure installation of TED.  The installation of 
TED requires the cover of the main electrical circuit breaker panel to be removed.  After the circuit 
breaker panel cover has been removed, the potential hazard of shock, burn, or even electrocution 
now exists.  Do not attempt to complete this installation unless you are a licensed electrician familiar 
with the electrical components and operation of the circuit breaker panel.   Even when the main circuit 
breaker has been turned to the “OFF” position, certain areas within the circuit breaker panel may still 
be electrified.  Do not attempt installation unless you know where these electrified areas are.

This symbol will be found throughout 
the  instructions  where  there  is  a  po-
tential for electric shock, burn, or even 
electrocution. Do not attempt to com-
plete the noted section if you are not 
an electrician, or qualified installer

.

WARNING 

- These servicing instructions are for use by qualified personnel only.  To reduce the risk of 

electric shock, DO NOT perform any servicing other than that contained in these operational instruc-
tions unless you are qualified to do so.

WARNING 

- The MTU must be connected to a switch or circuit breaker in close proximity to the equip-

ment and within easy reach of the operator.  It must be marked as the disconnecting device for the MTU.

WARNING

 - If the equipment is used in a manner not specified in these instructions, the protection 

provided by the equipment may be impaired.

TESTED TO COMPLY WITH 

FCC STANDARDS

FOR  HOME  AND  OFFICE  USE 

E

nErgy

, I

nc

. M

odEl

 TEd3000 / TEd P

ro

This device complies with part 15 of the FCC Rules.  

Operation is subject to the following  two conditions:    

(1) This  device  may  not  cause  harmful  interference, 

and   (2) This device must accept any interference received, 

including interference that may cause undesired operations. 

 

FCC Part 15 SubPart B

EU/EN 61326-1

netzerotools.com

netzerotools.com

Содержание Pro Commercial

Страница 1: ...or TED Pro CT Clamps Commercial Energy Monitor TED Pro WD Wireless Display for Commercial Energy Monitor TED Pro MTU HV Commercial Energy Monitor TED Pro MTU HV Commercial Energy Monitor TED Pro ECC C...

Страница 2: ...lation Page 18 Appendix A1 Page 19 Appendix A2 Page 20 Appendix A3 Page 21 Appendix A4 Page 22 Appendix A5 Page 23 PART I PART II PART III PART IV Appendix IMPORTANT The installation of your TED Pro s...

Страница 3: ...use multiple MTUs If your main service circuit conductors wires are larger than 1 25 inch diameter TED WILL NOT work Other TED models and accessories may be available for these applications Please se...

Страница 4: ...panel and Ethernet communication method must be used The MTU and ECC will need to be connected to the Local Area Network or connected to each other via Ethernet 2 Services with 400A parallel feeds wil...

Страница 5: ...3W Single Phase service derived from 3 Phase system North America 240 120V 1PH 3W North America 230V 1PH 2W Europe and most other countries in the world TED Pro Commercial MTU HV will not work on 120...

Страница 6: ...as are This symbol will be found throughout the instructions where there is a po tential for electric shock burn or even electrocution Do not attempt to com plete the noted section if you are not an e...

Страница 7: ...re are two or more main circuit breaker panels you will need one additional MTU for each main circuit breaker or panel For services with Wind Solar or Standby Generator an additional MTU will be requi...

Страница 8: ...MAX 1200A White neutral Black phase A Neutral Bus 15 20 or 30A Circuit Breaker CT s Main Circuit Breaker MAX 1200A A B C A B C A B A B C A B C A B Red phase B Phase B Blue phase C MTU Measuring Trans...

Страница 9: ...ral Black phase A Neutral Bus 15 20 or 30A Circuit Breaker CT s Main Circuit Breaker MAX 1200A A B C A B C A B A B C A B C A B Red phase B Phase B Blue phase C MTU Measuring Transmitting Unit Ethernet...

Страница 10: ...fluorescent lighting with noisy ballasts etc NOTE It is HIGHLY recommended that all MTU installations be made outside of the panel for ease of performing future firmware updates ease of ac cess withou...

Страница 11: ...nd NOTE 2 For optimal PLC Communication the ECC should be plugged into a circuit on the same phase as the black wire on the MTU power cable If the ECC cannot be connected to phase A the black MTU wire...

Страница 12: ...up to three 400A parallel conductors per phase up to 1200A by follow ing these steps Precision Measurement of Parallel Conductors 1 Purchase and install 1 CT Harness Kit Model ADP and 3 additional CT...

Страница 13: ...IMPORTANT THAT THE INSTALLING ELECTRICIAN VERIFY CORRECT OPERATION AND MEASUREMENT PRIOR TO LEAVING THE SITE ECC CONNECTION Select an electrical outlet free of other connections and connect ECC power...

Страница 14: ...ed instructions on installing the ECC NOTE For an Ethernet connected MTU Connect the ECC per above refer to TED Installation Utility on Page 18 item 1 Once the utility has located the TED Pro Commerci...

Страница 15: ...INSIDE Panel ECC PLC Power Line Carrier MTU HV mounted OUTSIDE Panel ECC Ethernet directly to ECC MTU HV mounted OUTSIDE Panel ECC Ethernet to Hub to ECC MTU HV mounted OUTSIDE Panel ECC Ethernet to...

Страница 16: ...and type in http 192 168 7 3 to access the MTU setup page Note If you connect the ECC or MTU directly to the computer with the computer set to 192 168 7 1 and you are unable to bring up the software...

Страница 17: ...HTTP box and enter in the ECC IP that is listed on the utility Shown on the utility as TED 6000 This completes the setup for the MTU 3000 To view the real time readings per phase directly from the MT...

Страница 18: ...ine it may say TED6000 select launch in browser NOTE After you have selected Launch in Browser you will see a grey screen and Loading should appear followed by the Footprints dashboard If your compute...

Страница 19: ...Page 19 Rev 1 0 13 Appendix A 1 AUTHORITY MTU HV netzerotools com netzerotools com...

Страница 20: ...Page 20 Appendix A 2 Tie White Wire to Neutral Bus MTU HV netzerotools com netzerotools com...

Страница 21: ...Page 21 Rev 1 0 13 Appendix A 3 MTU HV netzerotools com netzerotools com...

Страница 22: ...Page 22 Appendix A 4 MTU HV netzerotools com netzerotools com...

Страница 23: ...Page 23 Rev 1 0 13 Appendix A 5 A A PLC Signal BLACK WIRE ON THE MTU AND GW MTU HV netzerotools com netzerotools com...

Страница 24: ...ENERGY INC netzerotools com netzerotools com...

Отзывы: