TECNOVAP H100200 Скачать руководство пользователя страница 13

 

    

HYDRO

BOX 

 

 

  Pag

. 13 

 TECNOVAP 36/18 

8. 

MAINTENANCE 

8.1.  Boiler maintenance 

 

WARNING 

DISCONNECT THE POWER SUPPLY BEFORE CARRYING OUT ANY MAINTENANCE. 

 

WARNING ! DANGER OF SCALDING 

Cleaning of the appliance absolutely has to be carried out when cold (i.e. generator switched off 

for at least 5 hours), in the following way: (we therefore do advise to perform maintenance at the 

start of the next use, provided that at least 5 hours have passed since the former use). 

 

The  appliance  is  equipped  with  a  maintenance  warning  system  which  informs  the  user  of  the  need  to 

clean  the  boiler.  The  system  is  programmed  to  signal  this  condition  after  every  100  effective  working 

hours while showing the wording “C A L C” on the display. 

When  this  warning  is  displayed,  the  machine  can  in  any  case  be  used  until  the  started  operation  has 

been  completed.  Then  switch  off  the  appliance  with  the  main  switch  (06)  and  remove  the  power  plug 

(05). 

Place  a  suitably  sized  basin  under  the  appliance  and  remove  the  drainage  cap  (09)  underneath,  then 

wait for the boiler to be completely empty. 

Clean  any  dirt  off  the  cap  with  running  water,  check  that  the  seal  on  the  bottom  of  the  cap  is  in  good 

condition,  replace  if  necessary  (contact  your  supplier  for  spare  parts),  then  screw  the  cap  back  on  the 

machine. 

If the used water has a hardness of over 10 French degrees (depending on product use,> 2 hours/day) 

water  should be treated with special water softeners, these devices can reduce the calcium  carbonate 

content  in  the  water  to  below  4  French  degrees  significantly  improving  the  reliability  of  the  generator. 

(For further details or to purchase a softener filter, please do contact the manufacturer). 

The  boiler  cleaning  is  done.  Insert  the  power  cable  (05)  back  into  the  power  socket,  connect  the 

appliance  to  the  water  supply  and  activate  the  main  switch  (06).  Remember  to  also  activate  the  lever 

(22) on the hand grip to bleed out the air from the empty boiler.  

After completing boiler maintenance, proceed by following the instructions described in paragraph (c) of 

chapter 7.

 

 

 

 

 

Содержание H100200

Страница 1: ...This manual is available in digital format by submitting a specific request to the following address info tecnovap com HYDROBOX...

Страница 2: ...HYDROBOX Pag 2 TECNOVAP 36 18...

Страница 3: ...TOGETHER WITH THE APPLIANCE TO THE SUBSEQUENT OWNER BEFORE USING THE APPLIANCE FOR THE FIRST TIME YOU ABSOLUTELY HAVE TO READ THE SAFETY REGULATIONS GIVEN IN THIS MANUAL ANY DAMAGE CAUSED DURING TRAN...

Страница 4: ...ION CENTRE ELECTRICAL AND ELECTRONIC APPLIANCES BATTERIES OIL AND SIMILAR SUBSTANCES MUST NOT BE RELEASED TO THE ENVIRONMENT PLEASE DISPOSE OF THESE USING APPROPRIATE SEPARATED WASTE COLLECTION SYSTEM...

Страница 5: ...which can cut off the power supply if the leakage current to earth exceeds 30 mA for 30 ms or a checking device of the earth circuit SAFETY VALVE This appliance is fitted with two safety valves desig...

Страница 6: ...ssories and couplings recommended by the manufacturer WARNING Do not use the appliance if the power cable or other important parts have been damaged for example safety devices high pressure hoses or t...

Страница 7: ...gratulations for choosing this appliance With the aim of continuously improving and updating its range and offering increasingly innovative models TECNOVAP has developed designed and constructed HYDRO...

Страница 8: ...400000 Rated voltage V 400 230 Current type Hz 50 60 3 Rated power boiler kW 9 1 14 5 Power pump module kW 1 5 Max rated power kW Rated water pressure kPa bar 15 000 150 Max water rated flow l m 2 4 M...

Страница 9: ...pling 04 Coupling for water supply 05 Power cable 06 Main switch 07 Control panel 08 Pressure regulator of pump 09 Boiler drainage cap 10 Boiler drainage key supplied Hand grip 20 Hand grip 21 Hydraul...

Страница 10: ...HYDROBOX Pag 10 TECNOVAP 36 18 6 TECHNICAL DRAWINGS 22 21 23 20 03 04 05 07 06 09 01 10 02 08...

Страница 11: ...imultaneous intermittent acoustic signal Boiler switch Temperature reduction Activates disactivates the heating elements of the boiler If the temperature switch is activated the operating water temper...

Страница 12: ...activate the boiler switch as well as the pump switch Warning Operating the lever 22 on the hand grip 20 will cause the release of superheated high pressured water with up to a temperature of 90 C be...

Страница 13: ...e a suitably sized basin under the appliance and remove the drainage cap 09 underneath then wait for the boiler to be completely empty Clean any dirt off the cap with running water check that the seal...

Страница 14: ...tly this warning will appear every 500 working hours as indicated in the table Observe the replacement of the valve groups etc as described according to the working hours of the pump visualised on the...

Страница 15: ...ressure delivered by the pump is insufficient The water use is oversized compared to the due one or the nozzle is worn out Replace the nozzle on the lance with an adequate one see flow pressure on the...

Страница 16: ...ecifiche delle direttive conforms to the specifications of directives 2014 35 UE 2014 30 UE 2011 65 UE 2006 42 UE Per il controllo della conformit alle sopraindicate direttive sono stati seguiti i seg...

Страница 17: ...HYDROBOX Pag 17 TECNOVAP 36 18 Routine Maintenance Working hours of the generator Frequency of intervention Notes...

Страница 18: ...HYDROBOX Pag 18 TECNOVAP 36 18 Non Routine Maintenance Working hours of the generator Date of intervention Description of intervention replaced components etc...

Страница 19: ...HYDROBOX Pag 19 TECNOVAP 36 18 NOTES...

Страница 20: ...HYDROBOX Pag 20 TECNOVAP 36 18 THE MANUFACTURER RESERVES THE RIGHT OF TECHNICAL AND STRUCTURAL MODIFICATIONS AS WELL AS IMPROVEMENTS WITHOUT PRIOR NOTICE...

Отзывы: