TECNOVAP H100200 Скачать руководство пользователя страница 12

 

    

HYDRO

BOX 

 

 

  Pag

. 12 

 TECNOVAP 36/18 

7.  USING INSTRUCTIONS 

(a)  After  opening  the  packaging,  insert  the  manoeuvring  handle  (01)  in  the  relative  seat  and  secure  in 

place with the fixing screw (02). 

(b)  Connect the hand grip to the appliance (03) and insert one of the available lances (23) by screwing 

the fixing ring to secure everything;

 

(c)  Connect the appliance to the water supply (04) as indicated in chapter 3;

 

(d)  Insert  the  power  cable  (05)  in  a  power  outlet,  making  sure  that  the  voltage  and  amperage 

correspond to the values provided on the machine data plate;

 

(e)  Switch on the appliance by turning the main switch (06) to ON position and activate the boiler switch  

  as well as the pump switch  

 

Warning!! 

Operating  the  lever  (22)  on  the  hand  grip  (20)  will  cause  the  release  of  superheated  high-

pressured  water  with  up  to  a  temperature  of  90°C,  be  very  careful  that  this  lever  is  not 

activated inadvertently and that the water jet is never directed towards persons or animals. 

 

Partial counter reset 

The  switched-on  appliance  (ON)  should  be  in  standby  mode  (OFF  on  the  display),  then  press  and 

hold the temperature switch  

  

until the wording 

“C L R” appears on the display.

 

 

“C A L C” signal reset 

After maintenance, carried out by the user, switch on the appliance and activate the boiler switch  

  

as well as the pump switch 

 . Press and hold the boiler switch  

  and press the pump switch  

 , the wording 

“C L R” will immediately appear on the display and the appliance is thus resetted. 

 

 

 

 

 

 

 

 

Содержание H100200

Страница 1: ...This manual is available in digital format by submitting a specific request to the following address info tecnovap com HYDROBOX...

Страница 2: ...HYDROBOX Pag 2 TECNOVAP 36 18...

Страница 3: ...TOGETHER WITH THE APPLIANCE TO THE SUBSEQUENT OWNER BEFORE USING THE APPLIANCE FOR THE FIRST TIME YOU ABSOLUTELY HAVE TO READ THE SAFETY REGULATIONS GIVEN IN THIS MANUAL ANY DAMAGE CAUSED DURING TRAN...

Страница 4: ...ION CENTRE ELECTRICAL AND ELECTRONIC APPLIANCES BATTERIES OIL AND SIMILAR SUBSTANCES MUST NOT BE RELEASED TO THE ENVIRONMENT PLEASE DISPOSE OF THESE USING APPROPRIATE SEPARATED WASTE COLLECTION SYSTEM...

Страница 5: ...which can cut off the power supply if the leakage current to earth exceeds 30 mA for 30 ms or a checking device of the earth circuit SAFETY VALVE This appliance is fitted with two safety valves desig...

Страница 6: ...ssories and couplings recommended by the manufacturer WARNING Do not use the appliance if the power cable or other important parts have been damaged for example safety devices high pressure hoses or t...

Страница 7: ...gratulations for choosing this appliance With the aim of continuously improving and updating its range and offering increasingly innovative models TECNOVAP has developed designed and constructed HYDRO...

Страница 8: ...400000 Rated voltage V 400 230 Current type Hz 50 60 3 Rated power boiler kW 9 1 14 5 Power pump module kW 1 5 Max rated power kW Rated water pressure kPa bar 15 000 150 Max water rated flow l m 2 4 M...

Страница 9: ...pling 04 Coupling for water supply 05 Power cable 06 Main switch 07 Control panel 08 Pressure regulator of pump 09 Boiler drainage cap 10 Boiler drainage key supplied Hand grip 20 Hand grip 21 Hydraul...

Страница 10: ...HYDROBOX Pag 10 TECNOVAP 36 18 6 TECHNICAL DRAWINGS 22 21 23 20 03 04 05 07 06 09 01 10 02 08...

Страница 11: ...imultaneous intermittent acoustic signal Boiler switch Temperature reduction Activates disactivates the heating elements of the boiler If the temperature switch is activated the operating water temper...

Страница 12: ...activate the boiler switch as well as the pump switch Warning Operating the lever 22 on the hand grip 20 will cause the release of superheated high pressured water with up to a temperature of 90 C be...

Страница 13: ...e a suitably sized basin under the appliance and remove the drainage cap 09 underneath then wait for the boiler to be completely empty Clean any dirt off the cap with running water check that the seal...

Страница 14: ...tly this warning will appear every 500 working hours as indicated in the table Observe the replacement of the valve groups etc as described according to the working hours of the pump visualised on the...

Страница 15: ...ressure delivered by the pump is insufficient The water use is oversized compared to the due one or the nozzle is worn out Replace the nozzle on the lance with an adequate one see flow pressure on the...

Страница 16: ...ecifiche delle direttive conforms to the specifications of directives 2014 35 UE 2014 30 UE 2011 65 UE 2006 42 UE Per il controllo della conformit alle sopraindicate direttive sono stati seguiti i seg...

Страница 17: ...HYDROBOX Pag 17 TECNOVAP 36 18 Routine Maintenance Working hours of the generator Frequency of intervention Notes...

Страница 18: ...HYDROBOX Pag 18 TECNOVAP 36 18 Non Routine Maintenance Working hours of the generator Date of intervention Description of intervention replaced components etc...

Страница 19: ...HYDROBOX Pag 19 TECNOVAP 36 18 NOTES...

Страница 20: ...HYDROBOX Pag 20 TECNOVAP 36 18 THE MANUFACTURER RESERVES THE RIGHT OF TECHNICAL AND STRUCTURAL MODIFICATIONS AS WELL AS IMPROVEMENTS WITHOUT PRIOR NOTICE...

Отзывы: