Tecnosystemi PICO HP2 30 Скачать руководство пользователя страница 2

Accessories for

                       Air Conditioning

Ventilation

                        Solutions 

Air Curtains and

                       Accessories

 Accessories

                     For Heating

Instruments &

Tools

Multi - Zone

Air Control System

INTRODUCTION

This manual includes the technical description, operation,  installation and assembly instructions, 

technical data for the intake extractor unit with energy regeneration “PICO HP2”, “PICO RECO 

100”, hereinafter referred to as recovery unit.

SAFETY REQUIREMENTS

Read the user manual carefully before use and installation of heat reversible recovery unit with 
individual chamber with energy regeneration.
The installation and the operation of the recovery unit must be carried out in compliance with the 
user manual, as well as with applicable legislations, local and national laws and technical and 
electrical regulations.  The warnings, contained in the user manual, should be heeded, as they 
contain vital information for personal safety. 

Failure to follow the safety rules can result in damage to the recovery unit. Read this 

manual carefully and keep it for as long as the recovery unit is used. 

Legend of symbols used in the manual:

THE RECOVERY UNIT WAS NOT DESIGNED FOR USE BY CHILDREN, PERSONS WITH 

PHYSICAL OR MENTAL DISABILITIES, PERSONS WITH SENSORY DISABILITIES, OR 

PERSONS WITHOUT ADEQUATE QUALIFICATIONS.

THE INSTALLATION AND CONNECTION OPERATIONS CAN BE PERFORMED ONLY BY 

QUALIFIED PERSONNEL AFTER FOLLOWING THE ADEQUATE SAFETY TRAINING.

UNATTENDED CHILDREN SHOULD NOT BE ALLOWED ACCESS TO THE SITES WHERE THE 

FAN IS INSTALLED. 

USE OF THE RECOVERY UNIT

The recovery unit was designed to ensure the air exchange in apartments, holiday farms, hotels, 

bars and, in general, domestic and public places. 

The recovery unit is fitted with a ceramic exchanger which allows the air recirculation thanks to 

the energy regeneration with the heat from the intake air. 

The recovery unit was designed to be installed in premises on walls with a thickness between 310 mm 

and 500 mm (optional tube L=1,500 mm), for the “Pico Reco 100”, the minimum thickness is 370 mm.

The recovery unit was tested for continuous operation connected always to be mains supply. 

The transported air must not contain flammable or explosive mixtures, chemical substance 

vapours,  large  dust  particles,  soot  and  oil  particles,  dangerous  substances,  fibrous 

materials, pathogenic agents or other harmful substances.

MAIN TECHNICAL PARAMETERS

The recovery unit was designed for application within premises with a room 

temperature varying 

from -20°C to +50°C and relative humidity of up to 80%.

WARNING

PROHIBITION

02

Содержание PICO HP2 30

Страница 1: ...011 ACD100012 ACD100013 ACD100014 ACD100015 ACD100016 ACD100017 ACD100018 PICO WI RECO 100 WALL MOUNTED CROSS FLOW STATIC INTAKE EXTRACTOR FAN WITH HEAT RECOVERY EQUIPPED WITH EXTERNAL POWER SUPPLY OR...

Страница 2: ...PERSONS WITH SENSORY DISABILITIES OR PERSONS WITHOUT ADEQUATE QUALIFICATIONS THE INSTALLATION AND CONNECTION OPERATIONS CAN BE PERFORMED ONLY BY QUALIFIED PERSONNEL AFTER FOLLOWING THE ADEQUATE SAFETY...

Страница 3: ...t change the length of the power cord at your own discretion Do not bend the power cord Do not damage the power cord Do not touch the controls and the remote controls with wet hands Do not perform mai...

Страница 4: ...FROM 10 TO 50 REGENERATOR EFFICIENCY 90 90 90 HEAT EXCHANGE FILL MEDIA CERAMIC CERAMIC CERAMIC TUBE DIMENSIONS mm 103 128 153 PROTECTION IP 24 IP 24 IP 24 DIMENSIONS AND MODELS A B C D E F mm mm mm mm...

Страница 5: ...MED mA 550 640 700 MAXIMUM AIR FLOW RATE m h 70 81 91 RPM min 1 3395 4070 4500 SOUND PRESSURE AT 1m dB A 46 48 50 SOUND PRESSURE AT 3 m dB A 43 46 47 MAXIMUM AIR TEMPERATURE C DA 10 C A 50 C REGENERAT...

Страница 6: ...thermal energy of the intake air in order to heat the intake air flow For the PICO RECO 100 model the fill media is made of polyester The exchanger is fitted with a draw cord on the inside to make it...

Страница 7: ...OF MODEL PICO RECO 100 m h 80 HOLE 153 mm m h 50 HOLE 128 mm MAX POWER 1 4 W MAX POWER 3 6 W MAX POWER 2 3 W MAX POWER 8 4 W 100 m h 93 HOLE 204 mm m h 32 HOLE 103 mm ATTRACTIVE FRONT PANEL LED INDIC...

Страница 8: ...INTO THE ROOM OPTION TO REGULATE THE THREE SPEEDS PROVIDED THE DEVICE IS ON STANDBY WHEN THE AIR IN THE ROOM EXCEEDS THE HUMIDITY LEVEL THAT CAN BE SET AT 40 50 OR 60 THE DEVICE GOES ONTO RECOVERY MOD...

Страница 9: ...M IS ON STANDBY WHEN THE CO2 THRESHOLD IS EXCEEDED THE HEAT RECOVERY UNIT GOES ONTO HIGH SPEED RECOVERY WHEN THE CO2 VALUE RECOVERS THE UNIT GOES BACK ONTO STANDBY THE SYSTEM IS ON STANDBY WHEN THE CO...

Страница 10: ...TERNAL POWER SUPPLY X X PICO HP2 80 WI WITH EXTERNAL POWER SUPPLY X X PICO HP2 30 WI WITH BUILT IN POWER SUPPLY X X PICO HP2 55 WI WITH BUILT IN POWER SUPPLY X X PICO HP2 80 WI WITH BUILT IN POWER SUP...

Страница 11: ...X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X you selected has been set correctly Selected value 50 key for medium speed the LED changes from blue to yellow or white and you will s...

Страница 12: ...om exceeds the threshold of settable humidity at 40 50 or 60 the device switches to extraction only mode until the humidity level falls within the set values AUTO 6 The system is on standby When the C...

Страница 13: ...TER MAINTENANCE COMFORT COMFORT CO2 PURE AIR CO2 PURE AIR ILLUSTRATION OF COLOUR ICON OFF 40 50 60 40 50 60 ILLUSTRATION OF COLOUR ICON ON NOTE These are only illustrative screens that provide a gener...

Страница 14: ...ctric source and it will turn on see image 1 automatically in recovery mode blue led light Access the smartphone configuration and activation of the WI FI function 14 11 Gio 21 Marzo At the end of the...

Страница 15: ...unit models NOTE for diameters of the external tube please refer to page 4 for the recovery units mod PICO HP2 and page 5 for the recovery unit mod PICO RECO 100 WARNING THE RECOVERY UNIT SHOULD NOT...

Страница 16: ...ic 1 taking care to route it either from the right or left in the upper part of the duct in correspondence with the duct hole The mains can be laid out by means of a buried electrical sheath or an ade...

Страница 17: ...he wall and using the four 4x30 screws and the four dowels included in the supply see pic 3 pic 2 pic 3 6 Insert the elements consisting of the ceramic exchanger and the filters in the case of mod PIC...

Страница 18: ...ove the upper part of the external ventilation grille see pic 1 MODEL DIMENSIONS mm B H L L1 L2 DIAMETER D PICO WI HP2 30 154 110 15 45 87 100 1 2 PICO WI HP2 55 186 142 15 45 101 125 1 2 PICO WI HP2...

Страница 19: ...3 Mark the fixing holes for the external ventilation grille and drill For the sake of convenience use the back part of the grille see pic 2 pic 2 4 Fix the back part of the grille to the wall with 4x...

Страница 20: ...for the external ventilation grille and drill inserting the wall plugs provided ASSEMBLY OF THE INTAKE GRILLE RECOVERY UNITS MODEL PICO RECO 100 2 Fix the rear part of the grille to the wall with the...

Страница 21: ...e third recovery unit in the same way and so on allowing up to 4 recovery units to be connected in series Connecting the recovery units in series must be performed with the devices disconnected from t...

Страница 22: ...enance of fans once a year Remove the ventilator unit by pressing simultaneously on the two locks Clean the blades of the impeller In order to remove the dust use a soft brush a cloth or the vacuum cl...

Страница 23: ...ry and insert the dried filters in the duct Extraction is allowed The life span of the filters is of about 3 years For spare filters contact the seller Even regular maintenance cannot fully prevent th...

Страница 24: ...amages is ensured Avoid jolts and collisions during transportation and handling operations Possible causes Management of faults The fan does not start when the recovery unit is turned on No power supp...

Страница 25: ...di questo che presentino vizi o difetti The warranty lasts 2 years from the date of delivery The supplier company guarantees the quality of the materials used and the correct construction of the compo...

Страница 26: ...NOTE Ventilation Solutions Accessories For Heating Instruments Tools Multi Zone Air Control System 26...

Страница 27: ...NOTE Ventilation Solutions Accessories For Heating Instruments Tools Multi Zone Air Control System 27...

Отзывы: