BUILT-IN RECOVERY UNIT INSTALLATION
To install a built-in heat recovery unit, a rectangular opening in the wall is needed with minimum
dimensions of 49 cm in length x 23 cm in height in order to allow the metal body to be inserted,
and a further drainage point to allow the tube for condensation to pass.
Once the machine’s packaging has been opened, remove the recovery unit’s internal grille and
remove the exchange package in order to proceed with the installation operation.
Separate the recovery unit body from the telescopic assembly and remove the external grille.
The recovery unit body is to be positioned from the inside of the room into the opening made
previously, making sure that the two outer tabs are in line with the edge of the wall. Fixing to the
masonry is done with the special serrated metal tabs which must be embedded in cement during
the installation phase.
The telescopic connection assembly is to be positioned from the outside of the room, making sure
that the frame is in line with the edge of the wall. To fix it, use the serrated tabs extracted on the
same assembly, embedding them in cement.
Cut the 2 dividers which separate the suction/expulsion air flows in such a way that they can be
inserted into the seat provided on the external grille.
Note: the recovery unit comes with a drain for condensation. It is important to provide the tube to
run any condensation away at this stage of the operation.
Connect the drainage tube, making it come out of the hole made in the external grille.
Once the recovery unit body and the telescopic assembly are fixed, insert the exchange package into
its seat and assemble the internal grille, making sure to connect the control panel’s electrical power
supply terminals.
Assemble the external grille, making sure to check the correct position of the flow dividers.
WALL-MOUNTED RECOVERY UNIT INSTALLATION
To install a wall-mounted heat recovery unit, 2 holes are needed in the wall with a diameter of
170 mm, for air suction and expulsion, and a hole of 25 mm is needed for the drainage tube for
any condensation.
Once the machine’s packaging has been opened, remove the recovery unit’s internal grille and
IMPORTANT!
Installing the recovery unit must be done by a qualified person, in accordance with CEI
64-8.
ASSEMBLY OF “AIR PUR 3 PLUS” RECOVERY UNITS
WARNING!
THE RECOVERY UNIT SHOULD NOT BE INSTALLED IN
PLACES WHERE THE AIR DUCT MIGHT BE BLOCKED BY
BLINDS AND SHUTTERS, ETC. IN ORDER TO PREVENT
THE ACCUMULATION OR DEPOSIT OF DUST. MOREOVER,
THE BLINDS MIGHT OBSTRUCT THE NORMAL AIR FLOW IN
THE ROOM, MAKING THE OPERATION OF THE RECOVERY
UNIT INEFFICIENT
.
WARNING!
DO NOT PLACE THE DEVICE ABOVE DELICATE FURNITURE
OR PICTURES. DO NOT PLACE THE DEVICE ABOVE OR
NEAR ROOM THERMOSTATS.
WARNINGS FOR THE ASSEMBLY