Technibel M2Z P Скачать руководство пользователя страница 8

GB

8

7 - ELECTRICAL DIAGRAM

A1

Control board, zone 1

A2

Control board, zone 2

EV1

Control valve, zone 1

EV2

Control valve, zone 2

M1

Circulator, zone 1

M2

Circulator, zone 2

Q1

Circuit breaker, zone 1

Q2

Circuit breaker, zone 2

S4

Water temperature sensor (outgoing line, zone 1)

S41

Water temperature sensor (outgoing line, zone 2)

S5

Temperature ambiance sensor (zone 1)
Accessory

S51

Temperature ambiance sensor (zone 2)

Component symbols

Q2

PE
XA

Z1

Z2

P2

P1

A4 C

S4 C S5

N U

Y1 N Y2

+

-

A2

S41

S51

M2

1

~

N

U

12

XA

11

XA

EV2

BUS

BUS

P2

P1

A4 C

S4 C S5

N U

Y1 N Y2

+

-

A1

S4

S5

M1

1

~

N

U

2

XA

1

XA

EV1

Q1

12

11

12

11

12

11

12

11

Z1

Z2

PE

N

Ph

ELECTRICAL DIAGRAM  -  M2Z P

10 05 807 - 03

Power supply

230V / 1 / 50

Pump

Water probe

Ambiance

sensor 

Pump

Water probe

Ambiance

sensor

(accessory)

GENERAL MAINTENANCE

All equipment must be properly maintained in order to provide optimum performance over time. Faulty maintenance can result in
the cancellation of the product guaranty. Depending on the products, maintenance operations consist in the cleaning of filters (air,
water), internal and external exchangers, casings, and the cleaning and protection of condensate tanks. Treating odours and the
disinfection of room surfaces and volumes also contributes to the cleanliness of the air breathed by users.

Perform the following operations at least once per year 

(the frequency of operations depends on the installation and

operating conditions):

- Check the composition and condition of the coolant.
- Check operating points and setpoints.
- Check the safety devices: 
- Dusting of electrical boxes.
- Ensure that all electrical connections are properly tight.
- Check the ground connections.
- Check the hydraulic system (cleaning of the filter, water quality, purge, flowrate, pressure etc.).

Содержание M2Z P

Страница 1: ...ONAS SUELO HYDRAULIK MODUL F R 2 ZONEN FUSSBODEN HEIZUNG ODER K HLUNG M DULO 2 ZONAS SOALHO Mars 2009 10 11 465 F GB I E D P 02 Etiquette signal tique F GB I E D P NOTICE D INSTALLATION INSTALLATION I...

Страница 2: ...s of all current directives laws and regulations and according to recognized trade practices 1 3 VOLTAGE Before all operation check that the voltage indicated on the appliance rating plate corresponds...

Страница 3: ...ter sensor zone 2 16 Pressure taps for water output measurement zone 1 17 Pressure taps for water output measurement zone 2 2 PRESENTATION 2 1 DESCRIPTION 74 5 43 107 600 750 260 665 251 5 170 130 120...

Страница 4: ...Use the cable glands mounted on the unit see 4 2 4 Ensure that all installation grounds are interconnected Cables are not supplied Consult the module electrical diagram Also consult the installation...

Страница 5: ...ocation that is representative of the temperature in zone 1 Caution In this case the remote zone 1 sensor must be activated through parameterisation on the control unit refer to control s technical ma...

Страница 6: ...GURATION SETTING Set the button on the installation s control box to OFF Turn installation and module power on On the control unit configure the system for the 2 Floor Zones application parameter 70 2...

Страница 7: ...leeders located in the 2 zone module and heating module CAUTION An incorrect purge could result in malfunctions and damage to the heater of the heating module 0 10 20 30 40 50 60 70 80 90 0 0 5 1 1 5...

Страница 8: ...RAL MAINTENANCE All equipment must be properly maintained in order to provide optimum performance over time Faulty maintenance can result in the cancellation of the product guaranty Depending on the p...

Страница 9: ...GB 9...

Страница 10: ...F GB D P I E...

Страница 11: ...F GB D P I E...

Страница 12: ...dificarli senza preaviso En el inter s de mejoras constantes nuestros productos pueden modificarse sin aviso pr vio Unsere Produkte werden laufend verbessert und k nnen ohne Vorank ndigung abge ndert...

Отзывы: