7 - ELECTRICAL DIAGRAM
A1
Control board, zone 1
A2
Control board, zone 2
EV1
Control valve, zone 1
EV2
Control valve, zone 2
M1
Circulator, zone 1
M2
Circulator, zone 2
Q1
Circuit breaker, zone 1
Q2
Circuit breaker, zone 2
S4
Water temperature sensor (outgoing line, zone 1)
S41
Water temperature sensor (outgoing line, zone 2)
S5
Temperature ambiance sensor (zone 1)
Accessory
S51
Temperature ambiance sensor (zone 2)
Component symbols
Q2
PE
XA
Z1
Z2
P2
P1
A4 C
S4 C S5
N U
Y1 N Y2
+
-
A2
S41
S51
M2
1
~
N
U
12
XA
11
XA
EV2
BUS
BUS
P2
P1
A4 C
S4 C S5
N U
Y1 N Y2
+
-
A1
S4
S5
M1
1
~
N
U
2
XA
1
XA
EV1
Q1
12
11
12
11
12
11
12
11
Z1
Z2
PE
N
Ph
ELECTRICAL DIAGRAM - M2Z P
10 05 807 - 03
Power supply
230V / 1 / 50
Pump
Water probe
Ambiance
sensor
Pump
Water probe
Ambiance
sensor
(accessory)
GENERAL MAINTENANCE
All equipment must be properly maintained in order to provide optimum performance over time. Faulty maintenance can result in
the cancellation of the product guaranty. Depending on the products, maintenance operations consist in the cleaning of filters (air,
water), internal and external exchangers, casings, and the cleaning and protection of condensate tanks. Treating odours and the
disinfection of room surfaces and volumes also contributes to the cleanliness of the air breathed by users.
•
Perform the following operations at least once per year
(the frequency of operations depends on the installation and
operating conditions):
- Check the composition and condition of the coolant.
- Check operating points and setpoints.
- Check the safety devices:
- Dusting of electrical boxes.
- Ensure that all electrical connections are properly tight.
- Check the ground connections.
- Check the hydraulic system (cleaning of the filter, water quality, purge, flowrate, pressure etc.).