Technibel M2Z P Скачать руководство пользователя страница 6

GB

6

230 V power supply

BUS   A

Zone ambient
sensor(s)  

P

5 - START-UP

5.1 - VERIFICATIONS

• Ensure that the hydraulic connections are properly tight and that the hydraulic system operates correctly:

- purge of circuits,
- valve position,
- hydraulic pressure (1.5 to 3 bar).

• No leaks.
• Proper machine stability.
• Electrical cables and wires are well secured to their connection terminals. Loose terminals can cause heat build-up on the

terminal board and malfunctions.

• Ensure that the electric cables are properly protected from all sheet metal edges or metal parts that could damage them.
• Ensure that control cables and power cables are properly separated.
• Check that the unit is properly grounded.
• Make sure that no tools or any other objects have been left in the machine.

5.2 - CONFIGURATION / SETTING

• Set the button on the installation's control box to OFF.
• Turn installation and module power on.
• On the control unit, configure the system for the "2 Floor Zones" application 

(parameter 70 = 2)

; then check and adapt the

parameterization to the installation conditions (consult the control’s technical manual).

• Check that the setpoint settings of the generator regulator are compatible with the "2 Floor Zones" application.
• Check the position of the zone addressing micro-switches (Z1/Z2), see the diagram in § 7.

Before carrying out any work on the machine, make sure that it is switched off and that access to it is prevented.

Any work must be carried out by personnel qualified and authorised to work on this type of machine.

IMPORTANT NOTE

4.2.3 - ZONE BOARD CONNECTION DETAIL

4.2.4 - CABLE ROUTING

230 Vac

BUS

Zone ambient
temperature sensor

Valve control

Pump

control

Valve contact input

Zone addressing
micro-switch

Water temperature sensor
(floor outgoing line)

Содержание M2Z P

Страница 1: ...ONAS SUELO HYDRAULIK MODUL F R 2 ZONEN FUSSBODEN HEIZUNG ODER K HLUNG M DULO 2 ZONAS SOALHO Mars 2009 10 11 465 F GB I E D P 02 Etiquette signal tique F GB I E D P NOTICE D INSTALLATION INSTALLATION I...

Страница 2: ...s of all current directives laws and regulations and according to recognized trade practices 1 3 VOLTAGE Before all operation check that the voltage indicated on the appliance rating plate corresponds...

Страница 3: ...ter sensor zone 2 16 Pressure taps for water output measurement zone 1 17 Pressure taps for water output measurement zone 2 2 PRESENTATION 2 1 DESCRIPTION 74 5 43 107 600 750 260 665 251 5 170 130 120...

Страница 4: ...Use the cable glands mounted on the unit see 4 2 4 Ensure that all installation grounds are interconnected Cables are not supplied Consult the module electrical diagram Also consult the installation...

Страница 5: ...ocation that is representative of the temperature in zone 1 Caution In this case the remote zone 1 sensor must be activated through parameterisation on the control unit refer to control s technical ma...

Страница 6: ...GURATION SETTING Set the button on the installation s control box to OFF Turn installation and module power on On the control unit configure the system for the 2 Floor Zones application parameter 70 2...

Страница 7: ...leeders located in the 2 zone module and heating module CAUTION An incorrect purge could result in malfunctions and damage to the heater of the heating module 0 10 20 30 40 50 60 70 80 90 0 0 5 1 1 5...

Страница 8: ...RAL MAINTENANCE All equipment must be properly maintained in order to provide optimum performance over time Faulty maintenance can result in the cancellation of the product guaranty Depending on the p...

Страница 9: ...GB 9...

Страница 10: ...F GB D P I E...

Страница 11: ...F GB D P I E...

Страница 12: ...dificarli senza preaviso En el inter s de mejoras constantes nuestros productos pueden modificarse sin aviso pr vio Unsere Produkte werden laufend verbessert und k nnen ohne Vorank ndigung abge ndert...

Отзывы: