background image

16

KEY

PART NO.

DESCRIPTION

UNIT

1

SBHA-21-375

STEEL BRAID HOSE ASSEMBLY

1

2

SBHA-10-375E

STEEL BRAID HOSE ASSEMBLY

1

3

SBHA-9-375E

STEEL BRAID HOSE ASSEMBLY

1

4

FPH-375

PURGE FLEX HOSE CLEAR

PER FT

5

ZZACS61

POLY FLO TUBE 1/4

1

6

PFT-500

POLY FLO TUBE 1/2

PER FT

7

CFAO-375

COALESCING FILTER 3/8

1

9

DPB-100

DRYER PURGE BUCKET

1

10

CPT-100

COMPRESSOR PURGE TANK

1

11

RDC-100

REPLACEMENT DESICCANT CARTRIDGE

1

12

CV-375D-100

3/8 CHECK VALVE

3

13

DSV-230

PURGE VALVE SOLENOID VALVE 230V

1

14

SBHA-18-375

STEEL BRAID HOSE ASSEMBLY

3

15

CCH-230

LUBRICATED COMPRESSOR HEAD 230V

3

16

RFV-100

RUBBER MOUNTING FEET

4

17

PSC-3

PRESSURE SWITCH

1

18

POVA-100

SAFETY POP OFF VALVE

1

TRIPLE ULTRA CLEAN LUBRICATED COMPRESSOR

14

17

6

16

15

18

2

7

5

13

11

9

4

10

1

3

12

Содержание ACL2S1

Страница 1: ...rgyle Ave Fresno CA 93727 559 291 1650 800 428 7139 FAX 559 348 9677 TECH WEST INC Manufacturers of Dental Vacuum and Air Systems ULTRA CLEAN LUBRICATED COMPRESSOR INSTALLATION AND SERVICE MANUAL Revi...

Страница 2: ......

Страница 3: ...and Changing the Oil 7 Figure 4 Replacing Oil Indicator Lens 7 Parts Breakdown 8 11 Dessicant Dryer Parts Breakdown 12 Coalescing Filter Parts Breakdown 13 Single Ultra Clean Lubricated Compressor Ass...

Страница 4: ...Maintenance Service Notes 2...

Страница 5: ...een these values Circuit breaker switches must be 20 30 amp depending on model and voltage necessary 2 Local code may require you to provide one quick disconnect safety switch for the compressor 3 See...

Страница 6: ...b Remove the Lubricated Compressor from its shipping skid Inspect the unit for damage Lubricated Compressors are shipped bolted to a pallet This pallet is intended for shipping only and should be dis...

Страница 7: ...ATION 2 3 CONNECTIONS Electrical Connection to disconnect and electrical panel 220 v 110 v 220 v on the single models only Air Out Connection to building supply line Alternate Air Connection to fresh...

Страница 8: ...or life and efficiency f Replace the moisture indicator on the compressor part MI 100 6 ULTRA CLEAN LUBRICATED COMPRESSOR INSTALLATION 4 START UP STEPS a Make sure the shut off valve from the compress...

Страница 9: ...through oil filler spout Do not overfill Keep filled to level as shown below Oil should be changed annually or when oil becomes discolored Check oil level with compressor off and compressor sitting le...

Страница 10: ...ELAND COMPRESSOR HEAD 1HP 1 2 CCH 230 230 V COPELAND COMPRESSOR HEAD 1 HP 1 3 CF 115 115 V COOLING FAN 1 4 CF 230 230 V COOLING FAN 1 5 CFS 100 COMPRESSOR FAN SHROUD 1 6 CFG 100 FINGER GUARD 1 7 OSG 1...

Страница 11: ...A 230 230 V ONLY CAP AND RELAY ASSEMBLY COMPLETE 1 4 PR 115 115 V POTENTIAL RELAY 1 5 PR 208 208 230 V ONLY POTENTIAL RELAY 1 6 RCC 115 115 V RUN CAPACITOR 1 7 RCC 208 208 230 V RUN CAPACITOR 1 8 RCC...

Страница 12: ...G 250 COMPRESSOR GAUGE 1 2 BV 250 1 4 BALL VALVE 1 3 MI 100 MOISTURE INDICATOR 1 4 FA 4 4 1 4 FLARE HOSE FITTING 1 5 BN 250 CL 1 4 BRASS CLOSE NIPPLE 1 6 BT 250 1 4 BRASS TEE 1 7 BSE 250 1 4 BRASS ELB...

Страница 13: ...CK VALVE MALE TO FEMALE CONNECTION 1 2 CPT 100 COMPRESSOR PURGE TANK 1 3 CV 375D 100 3 8 CHECK VALVE 1 3 4 HA 12 250 1 4 HOSE ASSEMBLY 12 LONG 1 5 DPC 1 DRYER PRE COOLER SINGLE COMPRESSOR 1 6 DPC 2 DR...

Страница 14: ...V 250 METERING VALVE 1 6 SN 250 CL STAINLESS STEEL NIPPLE 1 4 3 7 FE 4 6 FLAIR FITTING 1 4 X 3 8 1 8 BV 250 BALL VALVE 1 4 1 9 BT 250 BRASS TEE 1 4 2 10 PFH 375 CLEAR DRAIN HOSE PER FOOT 11 MSD 100 MO...

Страница 15: ...13 FILTER ASSEMBLY 1 2 3 KEY PART NO DESCRIPTION UNIT 1 CFAO 375 COALESCING FILTER ASSEMBLY 3 8 1 2 CFEO 375 COALESCING FILTER ELEMENT 3 8 1 3 CFBP 375 COALESCING FILTER BOWL 1...

Страница 16: ...T 500 POLY FLO TUBE 1 2 PER FT 7 CFAO 375 COALESCING FILTER 3 8 1 9 DPB 100 DRYER PURGE BUCKET 1 10 CPT 100 COMPRESSOR PURGE TANK 1 11 RDC 100 REPLACEMENT DESICCANT CARTRIDGE 1 12 DSV 115 1 4 CHECK VA...

Страница 17: ...ALESCING FILTER 3 8 1 9 DPB 100 DRYER PURGE BUCKET 1 10 CPT 100 COMPRESSOR PURGE TANK 1 11 RDC 100 REPLACEMENT DESICCANT CARTRIDGE 1 12 CV 375D 100 3 8 CHECK VALVE 2 13 DSV 230 PURGE VALVE SOLENOID VA...

Страница 18: ...LESCING FILTER 3 8 1 9 DPB 100 DRYER PURGE BUCKET 1 10 CPT 100 COMPRESSOR PURGE TANK 1 11 RDC 100 REPLACEMENT DESICCANT CARTRIDGE 1 12 CV 375D 100 3 8 CHECK VALVE 3 13 DSV 230 PURGE VALVE SOLENOID VAL...

Страница 19: ...17 Figure 5 Compressor Wiring Diagram...

Страница 20: ...s YES NO YES YES Replace intake filter Contact Tech West YES Does unloader valve system function properly YES Does com pressor run too hot or too frequent 1 Locate and repair leaks 2 Ventilate if room...

Страница 21: ...or does start capacitor feel hot NO YES Is there continuity across terminal 2 5 or potential relay NOTE 1 Tape relay box If starts relay is bad 2 Check for continuity across 2 5 Replace if none Wiring...

Страница 22: ...t Tech West YES Is there a blockage in the air lines YES Locate and repair Note Close shut off valve Pump up tank to 100 psi If pres sure is main tained for 15 20 min leak is in office lines Run unit...

Страница 23: ...or does start capacitor feel hot NO YES Is there continuity across terminal 2 5 or potential relay NOTE 1 Tape relay box If starts relay is bad 2 Check for continuity across 2 5 Replace if none Wiring...

Страница 24: ...n the air lines YES Locate and repair Note Close shut off valve Pump up tank to 100 psi If pres sure is main tained for 15 20 min leak is in office lines Run unit in manual purge mode for one week If...

Страница 25: ...r does start capacitor feel hot NO YES Is there continuity across terminal 2 5 or potential relay NOTE 1 Tape relay box If starts relay is bad 2 Check for continuity across 2 5 Replace if none Wiring...

Страница 26: ...24 Maintenance Service Notes...

Страница 27: ...25 Maintenance Service Notes...

Страница 28: ...2625 N Argyle Ave Fresno CA 93727 559 291 1650 800 428 7139 FAX 559 348 9677 TECH WEST INC Manufacturers of Dental Vacuum and Air Systems...

Отзывы: