InstallatIon
Installation
sK 2
| 5
ENGL
IS
H
f
f
Create a sufficiently sized gravel bed within the strip
foundation.
4. Installation
Material losses
note the maximum load bearing capacity of the sup-
port (see chapter "specification / Data table").
!
Material losses
the t-support may bend if the heat pump is subject
to any lateral load.
f
f
Do not exert any pressure on the sides of the heat
pump.
D
00000
69
18
8
f
f
Mark out the holes on the strip foundation.
f
f
Drill the holes.
f
f
anchor the t-support to the strip foundation with suitable
fixing materials. the fixing materials are not included in
the standard delivery.
D
00000
76
90
8
f
f
secure the t-support to the underside of the heat pump
using the screws and washers provided.
5. Specification
5.1 Data table
SK 2
236693
Height
mm
303
Width
mm
450
Weight
kg
6.5
Weight loading
kg
91