© 2021
Order #XXXXX
Locked layer contains
placeholder marks.
Plan View
10’
20’
VK-4040 Single-Sided Lightbox
REV 9/2021
If you would like to tell us about your experience with your setup instructions please email us at
[email protected]
SETUP INSTRUCTIONS
Страница 1: ...der XXXXX Plan View 10 20 VK 4040 Single Sided Lightbox REV 9 2021 If you would like to tell us about your experience with your setup instructions please email us at info classicexhibits com SETUP INSTRUCTIONS ...
Страница 2: ... 2021 Order XXXXX 1 sq foot Grid View ...
Страница 3: ...ailed explanation for assembly WARNING Cleaning Packing For Cleaning Metal Plex Laminate Parts Use a MILD NON ABRASIVE cleanser and soft cloth paper towel to clean all surfaces Keep exhibit components away from heat and prolonged sun exposure Heat and UV exposure will warp and fade components Retain all provided Packing Materials All provided packing materials are for ease of repacking component p...
Страница 4: ...er connectors 1 Place extrusions end to end 2 Loosen all knobs then slide straight connectors across the seam of extrusions Disassembly 1 Loosen all knobs 2 Slide connectors off of one extrusion 3 Tighten knobs to prevent loss during packing shipping CEI110 Profile Slide both connectors across seam of extrusions Tighten all knobs Corner Connection 3 Tighten all knobs to secure connection Disassemb...
Страница 5: ...tep 1 for opposite corner C then insert corner B followed by corner D to complete the installation of the corners Step 3 Once all corners are inserted press one silicon edge into channel from corners and work toward the center Make sure welt is fully inserted into channel Continue until all sides are done Smooth out edges of graphic It is important to first insert graphic into each alternate corne...
Страница 6: ... 2021 Case 1 of 3 Order XXXXX Top View of Each Level Graphics Level 1 Bottom level Level 2 Monitor Mount 1 2 3 4 5 7 9 12 Case Packing ...
Страница 7: ... 2021 Case 2 of 3 Order XXXXX Top View of Each Level Graphics Level 1 Bottom level Level 2 6 20 21 8 11 13 Case Packing ...
Страница 8: ... 2021 Case 3 of 3 Order XXXXX Top View of Each Level Top View of Each Level Setup Hardware Setup Hardware Level 1 Bottom level 14 10 15 16 17 17 18 18 19 Level 1 Bottom level Case Packing ...
Страница 9: ...ription 47 5 h CEI110 Vertical Extrusion 47 5 h CEI110 Vertical Extrusion 47 5 h CEI110 Vertical Extrusion 47 5 h CEI110 Vertical Extrusion 46 w CEI110 Horizontal Extrusion 46 w CEI110 Horizontal Extrusion 46 w CEI110 Horizontal Extrusion 46 w CEI110 Horizontal Extrusion 46 w CEI110 Horizontal Extrusion 46 w CEI110 Horizontal Extrusion 46 w CEI110 Horizontal Extrusion 46 w CEI110 Horizontal Extrus...
Страница 10: ... Connect power cords to Supernova lights as shown Power Female Transformer 96W 4 Amp 24V Lights Male Light to Light Attachment Maximum of 7 lights per chain 7 lights per Transformer Light to Transformer Attachment Power Break Power Break Power Break Power Break Lightbox Wiring ...
Страница 11: ... Monitor Mount Attachment detail 3 Apply SEG Blocker to back of lightbox assembly Attach Stand off barrels to Z45 extrusions using bolts Connect Monitor Mount to Standoff Barrels Z45 Stand Off Barrels Monitor Mount Attachment SEG Graphic Note Monitor mounts install through SEG graphic Monitor Mount Bolts using Bolts Stand Off Barrels 18 18 17 17 Completed Assembly SEG Graphic SEG Blocker Attachmen...