background image

26 

44 1683 001M1-D     

MasterDrainer 80 Kombi

 

3.4.

 

Collecting using the collecting pan 

The draining off of used oil is to be carried out with the engine at operating 
temperature. Due to the low viscosity of the warm oil the duration of the oil change is 
shortened considerably. 

Before draining it is to be checked whether sufficient remaining volume is still 
available in the tank for the oil to be collected. 

Place the oil disposer under the vehicle, bring the collecting pan into the desired 
position and lock in place using the eccentric cylinder clamp.  

It is to be ensured that the ball valve under the collecting pan is opened. 

Open the oil drainage plug on the vehicle and let the oil run into the collecting pan.  

 

3.5.

 

Empty collecting tank 

The tank is to be emptied when the marking on the level indicator is reached. For 
drainage the suction hose is used as drainage hose. 

Connect the ball valve to the drainage hose, to the collecting pan and to the ejector. 

With opened ball valve the oil can be conveyed from the collecting tank into the 
open. 

 

Connect the compressed air supply to the central spigot for drainage 

 

Manometer changes over to the overpressure range 

 

After reaching the operating pressure (0.7 bar) the drainage process can be 
initiated 

 

Remove the suction probe from the drainage hose and keep the hose in a 
suitable container and, if required, secure it against dropping out 

 

Start the drainage process by opening the ball valve on the drainage hose 

Tanks which are emptying will also draw out air. Through this knocking can occur in 
the drainage hose. 

 

Following completion of drainage close the ball valve on the drainage hose, 
disconnect the equipment from the compressed air supply and plug on the 
suction probe again. 

 

The ball valve on the compact valve is to remain open for the ventilation of the 
tank. 

 

 

 

Содержание Masterdrainer 80 Kombi

Страница 1: ...44 1683 001M1 D MasterDrainer 80 Kombi 17 Translation of the original operating manual Operating Manual Masterdrainer 80 Kombi Art no 013854880...

Страница 2: ...ction using the suction probe 24 3 3 1 Preparation of the vacuum 24 3 3 2 Suction extraction 24 3 3 3 Suction output 25 3 4 Collecting using the collecting pan 26 3 5 Empty collecting tank 26 4 Schedu...

Страница 3: ...ufficient knowledge of the operating manual Copyright HORN GmbH Co KG All rights reserved Text graphics and layout copyright protected Reproduction and copying including in part only permitted with wr...

Страница 4: ...e liquids listed and the purpose described Using the machine for any other purpose would constitute inappropriate use The manufacturer is not responsible for any loss arising as a result of this the r...

Страница 5: ...on devices for flammable and or water endangering substances During such works appropriate tools are to be used avoid sparking Before any kind of work on the device all fuel lines are to be completely...

Страница 6: ...e and silencer serve for the creation of a vacuum with suction extraction The underpresssure available can be controlled during the extraction process at the vacuum gauge For drainage the tank is char...

Страница 7: ...431 2 4 Technical data The following table shows the data of the MasterDrainer 80 Kombi Item Data Comments Tank volume approx 80 litres Effective capacity approx 70 litres Media temperature 50 C max...

Страница 8: ...irty and condensed water It is strongly recommended that clients use a compressed air filter with the water separator 3 3 Extraction using the suction probe The suction extraction of oil from passenge...

Страница 9: ...Close the ball valve on the ejector and disconnect the air supply To end the suction extraction process close the ball valve on the suction hose again 3 3 3 Suction output The suction output of the e...

Страница 10: ...reached For drainage the suction hose is used as drainage hose Connect the ball valve to the drainage hose to the collecting pan and to the ejector With opened ball valve the oil can be conveyed from...

Страница 11: ...lity of the safety valve is to be examined at least once a year For this charge the tank with compressed air the safety valve must open with 1 2 0 1 bar In particular the compact valve is to be cleane...

Страница 12: ...al However if you should require further assistance please contact the Horn service department 6 Dispoal The device is to be emptied completely and the liquids properly disposed of in case it is taken...

Страница 13: ...44 1683 001M1 D MasterDrainer 80 Kombi 29 7 Outline drawing...

Страница 14: ...mpact valve Compressed air connection discharging Ball valve ejector Silence Ejector Tubular pipe with suction probe Suction probe connection Ball valve suction hose Suction extraction hose Ball valve...

Страница 15: ...44 1683 001M1 D MasterDrainer 80 Kombi 31 8 Spare parts list...

Страница 16: ...32 44 1683 001M1 D MasterDrainer 80 Kombi 9 Declaration...

Страница 17: ...44 1683 001M1 D MasterDrainer 80 Kombi 33 10 Notes...

Страница 18: ...34 44 1683 001M1 D MasterDrainer 80 Kombi HORN GmbH Co KG Munketoft 42 24937 Flensburg Germany T 49 461 8696 0 F 49 461 8696 66 www tecalemit de info tecalemit de...

Отзывы: