background image

Ref.

 

Description

 

1

 

Front layshaft bearing

 

2

 

Rear layshaft bearing

 

3

 

Front mill rotor bearing

 

4

 

Rear mill rotor bearing

 

Driveshaft bearing 

Ref.

 

Description

 

6

 

Conveyor drive roller bearings

 

7

 

Conveyor driven roller bearings

 

8

 

Bale chamber drive pivot

 

9

 

Bale chamber drive sprocket lower 

bearing

 

10

 

Bale chamber drive sprocket upper 

bearing

 

11

 

Bale chamber tensioner pivot

 

12

 

Bale chamber tensioner boss  

13 

PTO shaft cross journals, guard 

bearings & sliding members.

 

14 

Bale chamber support rollers 

15 

Conveyor belt support rollers 

For more detailed information 

see maintenance section 

Notes:  

Use good quality semi-solid 

grease for all procedures detailed above. 

50 Hours 

20 Hours 

Lubrication Schedule - Tomahawk C12 

Ref.

 

Description

 

16

 

Ring hitch – as required

 

17

 

Wheel bearings - annually

 

Other 

1-3 

7-11 

16 

14 

13 

13 

12 

15 

17 

14 

Содержание Tomahawk C12

Страница 1: ......

Страница 2: ...Safety requirements of EEC Directive 2006 42 EC 2004 108 EC To effect correct application of the essential Health and Safety requirements stated in the EEC Directives the following harmonised standard...

Страница 3: ...ty Regulations and therefore poses no significant hazard to health when properly used Nevertheless in the interests of all concerned it is essential that equipment of our manufacture is used in accord...

Страница 4: ...c highway 6 7 Preparation of the machine 6 8 Preparation of the tractor 7 9 Fitting the machine onto the tractor 7 10 Operating instructions loading 9 10 Operating instructions discharge 9 11 Machine...

Страница 5: ...ive sprocket upper bearing 11 Bale chamber tensioner pivot 12 Bale chamber tensioner boss 13 PTO shaft cross journals guard bearings sliding members 14 Bale chamber support rollers 15 Conveyor belt su...

Страница 6: ...of the bale to be loaded at one time 1 3m x 1 2m x 2 5m Maximum round bale size 1 8m Tyre size 385 55 R22 5 Wheel track 2 0 m Wheel load rating 4 500 Kg per wheel Wheel speed rating 25mph 40km h Weigh...

Страница 7: ...ear Tractor Control Desk Panel Maximum hydraulic circuit pressure Safety decals fitted to the machine provide important and useful information that will help make sure the machine is operated safely I...

Страница 8: ...g hazard keep clear Bale Chamber Alignment Arrow DL1052 red DL1442 yellow Grease Decal Every 20 Hrs Grease Decal Every 50 Hrs Grease Labelling Grease Labelling Grease Labelling Jack Information Label...

Страница 9: ...ydraulic hoses always make sure the conveyor is fully folded over the bale chamber to avoid residual pressure in the hoses 3 14 When changing a wheel make sure that the machine is on firm level ground...

Страница 10: ...t power up and the Bluetooth connection LED will not illuminate If the fuse on the power lead to the machine should blow it will be indicated by the red LED illuminating on the in line fuse holder The...

Страница 11: ...e conveyor Make sure the conveyor is straight lowered before running 9 4 Programming Electronic Controls Before adjusting the settings for the rotational speed of the bale chamber it will be necessary...

Страница 12: ...he machine is not recommended particularly where the milled material is being fed to animals It is recommended that string or netwrap is removed from the bales on the ground and then the material to b...

Страница 13: ...osition 11 0 MACHINE PROTECTION DEVICES IMPORTANT The machine is fitted with a shear bolt on the PTO shaft connecting the tractor to the machine If the PTO shaft is engaged harshly or after a blockage...

Страница 14: ...not reach the end of their travel and fail to apply the brakes To do this safely jack up one side of the axle until the wheel is clear of the ground Turn the adjusting nut on the brake lever clockwise...

Страница 15: ...en replacement Never attempt to remove the screen unless the PTO has been disengaged the engine has been stopped the key removed and the machine come to rest Whilst power is connected to the machine t...

Страница 16: ...pivot rod mounting holes in the support discs of the mill rotor for elongation and wear The pivot rod should also be inspected for wear if lightly worn it can be installed with the hammers in a diffe...

Страница 17: ...t s fully slack position Lift the belt and remove the pin from the joint Pull the belt from the conveyor frame Reassembly is the reverse of the above procedure 12 16 Hydraulic Circuit Never attempt to...

Страница 18: ...the cone 13 OPTIONAL EXTRAS 13 1 Screen Sizes There are 6 different screen sizes available 100 75 60 40 30 20mm for milling straw For information regarding milling grain please contact the head offic...

Страница 19: ...in has come off sprockets Check sprocket condition fit the chain and tension it Bale chamber chain broken Check sprocket condition and replace chain Bale chamber chain is slipping Check tension of bot...

Страница 20: ...sk turned off faulty Ensure control desk is on and connected See solutions in control desk section above Auxiliary stop button depressed Release stop button Material jamming conveyor Visually inspect...

Страница 21: ...nal pressure in valve Clamping bolts loose Check bolts through valve tightened to correct torque specified in the maintenance section Separation of slices in valve block as a result of reverse oil flo...

Страница 22: ...19 Rotor Hammer Layout...

Страница 23: ...Notes...

Страница 24: ......

Отзывы: