RBK-X1 CE
PN 2234800-2 / -4 / -6
Page 35 Rev B Apr 2020
4.2.10
Routine Maintenance
The RBK- X1 requires only the minimum of maintenance. However, the following checks must be
carried out on a weekly basis:
1. Check the cooling fan is operating correctly and air is flowing through the rear vent panel.
2. Remove front cover. Check for correct clearance (a minimum of 75mm clear space) and
obstructions.
3. Wire Grippers. Check visually for correct operation and signs of wear.
4. Manual Release. Check that manual release levers operate freely.
5. Clean the tube hot melt left on the heating element and loading position.
Содержание RBK-X1 CE
Страница 45: ...RBK X1 CE PN 2234800 2 4 6 Page 44 Rev B Apr 2020 Right Cover Securing Screws 7X...
Страница 51: ...RBK X1 CE PN 2234800 2 4 6 Page 50 Rev B Apr 2020 6 Schematic Diagram...
Страница 52: ...RBK X1 CE PN 2234800 2 4 6 Page 51 Rev B Apr 2020...
Страница 53: ...RBK X1 CE PN 2234800 2 4 6 Page 52 Rev B Apr 2020...
Страница 55: ...RBK X1 CE PN 2234800 2 4 6 Page 54 Rev B Apr 2020 9 Declaration of conformity of CE...