3.4
Installing a Cable Clamp
Cables may enter the panel from the rear left or rear right side or both sides. Two cable clamps
are provided. Often only one cable clamp is used. Additional clamps can be ordered as
accessories. Use the following procedure to install a cable clamp.
1. Determine in the cable entrance location.
2. Refer to the appropriate procedure in this manual for routing cable to and within the panel.
3. Install the cable clamp as shown in
.
Figure 15. Cable Clamp Assembly for OSP Cable
3.5
Installing an MPO Cable With MPO Cassettes
This section describes how to install an MPO cable with MPO cassettes into an FPX panel that
has been loaded with MPO adapters.
Use the following procedure.
1. Determine the direction of cable entrance and install the cable clamp following the basic
2. Follow the routing shown in
.
Note:
Assure that the cable clamp is suitable for MPO cables.
REAR COVER CAN BE REMOVED
TO AID IN O
S
P CABLE ROUTING
256
8
5-A
GROMMET
(
S
IZE DETERMINED
BY DIAMETER OF
O
S
P CABLE)
RIGHT
S
IDE
O
S
P CABLE
ENTRANCE
REAR
VIEW
S
CREW (2)
YOKE (2)
CAPTIVE
S
CREW (2)