409-35001
Rev C
9
of 92
3.
INSTALLATION
This section describes the installation steps and requirements for CBP, CSP, and CMP presses.
CBP INSTALLATION
Uncrating
The press, monitor, leveling feet, and other removed parts are shipped on one pallet, which is shrink-
wrapped for protection. Remove the shrink-wrap and unpack the monitor and other shipped parts.
Remove Press from pallet by unbolting hold-down bolts on four legs and lifting up with a forklift or hoist.
Put the fork lift legs underneath either side of the head assembly. See arrows below in Figure 6. The fork
lift legs should be wrapped with plastic or wood in hopes to not harm the back windows of the machine.
NOTE
Lift from bottom of structure. Keep forks spread as wide as possible for better stability.
Initial Assembly
1. Using the four supplied Foot Levelers (PN 2256177-1), install the four Levelers to bottom of Press and
adjust X / Y axis of tabletop level with a ‘bubble’
gauge.
Figure 6
2. Install customer-supplied 3-conductor power cord appropriate for the available voltage and current
capacity (200-240VAC, single phase, 6A) on back of CBP.
3. Route customer supplied 3-conductor power cord through the strain relief on the side of the Press.
Connect ground conductor to
stud marked “PE” on the side of the Press frame. Connect line
conductors to Master Power Switch terminals.
4. Install customer-
supplied industrial airline to ‘Quick Disconnect’ on optional Air Table foot switch, if
applicable.
Содержание 2216055
Страница 34: ...409 35001 Rev C 34 of 92 Figure 35 Figure 36 ...
Страница 71: ...409 35001 Rev C 71 of 92 Figure 77 ...
Страница 72: ...409 35001 Rev C 72 of 92 Figure 78 Figure 79 ...
Страница 75: ...409 35001 Rev C 75 of 92 Figure 82 Figure 83 ...