10
1.4.2.2
Installation Steps
1.
Attach connection plates, one on each side of the power supplies, using 12 pan head screws,
12 helical spring-lock washers and 12 plain washers as illustrated in Figure 8.
Figure 8: Three 20V‐40V Units Connection Plates 3U Assembly
2.
Attach output short plates, one on each triple of terminals, using eight flat head screws as
illustrated in Figure 9.
Figure 9: Three 20V‐40V Units Output Short Plates Assembly
Connection Plate 3U
Plain Washer, No. 10, Stainless Steel
Helical Spring‐Lock Washer, No. 10, Stainless Steel
10‐32 x 5/16 Pan Head Screw, Stainless Steel
Tightening torque: 25.4‐31.7 Lbf‐inch (2.87‐3.58Nm).
M3 x 4C Flat Head Screw, Nickel Plated
Tightening torque: 4.7‐5.7 Lbf‐inch (0.53‐0.64Nm)
Output Short