19
TCS 3000 Installation
www.tcsmeters.com
Total Control Systems
Installation Procedure — LPG 2
-
Stage Preset Valve
GREEN
BLACK
BLACK
S2
-
Slow Flow Shut
Off Solenoid Valve
Installation Procedure:
1.
Using the bolts and gasket provided, install the 757 LPG valve on the outlet (downstream) side of the meter.
2.
Follow the instructions provided with the valve for wiring the solenoid.
3.
Mount the 3 Way Valve directly to the TCS3000 register and follow the instructions provided with the Valve
*Note: Use Correct Thread Sealant*
4.
Once the solenoid is wired, run the corresponding wire as pictured using a minimum of 18 gauge shielded cable
into the back of the TCS 3000 register. The 3
-
Way Valve will be wired into Solenoid 1 (S1) on the terminal board
and the Slow Flow Bypass Valve will be wired into Solenoid 2 (S2).
5.
Insert the solenoid wiring into the cable gland. Wire the solenoid into the correct solenoid location on the termi-
nal board. Leave a small amount of slack on the wiring.
6.
Compress the cable gland on the TCS 3000 register until it is snug on the solenoid wire.
7.
TCS 3000 register product programming for Valve Type should be set to Dual Stage.
*When Calibrating the Unit Set Up Valve Type as 1001*
S1 – Fast Flow
Solenoid Valve