B. The opening of the pipe must be block ed and capped while it passes through the wall.
C. The pipe shall not be placed on the ground or rubbed against the ground.
D. T he pipe opening shall be upside down while removing the burr after cutting the pipe.
E. Remember that the pipe opening must be plugged while cond ucting the piping operations in rainy
days.
3.
Welding Operations
1)
The welding operation shall be carried out in a downward or lateral state and the overhead welding
operation shall be avoided.
70
/
113
Содержание TCA-18HRA/DVO
Страница 1: ...Technical Manual for DC Inverter Air Conditioner 1 113...
Страница 13: ...DC Inverter Air 1 4 Electrical Wiring Diagram 13 113...
Страница 14: ...DC Inverter Air 1 5 Air Velocity and Temperature Distributions Airflow velocity 14 113...
Страница 22: ...DC Inverter Air 22 113...
Страница 28: ...DC Inverter Air 2 3 Service Space 2 4 Wiring Diagrams 28 113...
Страница 41: ...DC Inverter Air 3 2 Wirin g Diagra ms 41 113...
Страница 42: ...DC Inverter Air A irflow velo city Discharge angle 60 FLOOR 42 113...
Страница 43: ...DC Inverter Air Airflow velocity Temperature 43 113...
Страница 64: ...DC Inverter Air 7 2 Electrical Wiring Diagram 2 1 TCA 36HRA DV 64 113...
Страница 65: ...DC Inverter Air 2 2 TCA 48H RA DV3 TCA 60HRA DV3 65 113...
Страница 66: ...DC Inverter Air 2 2TCA 18HRA DVO TC A 24HRA DVO 66 113...
Страница 82: ...DC Inverter Air 82 113...