L2 Repair Document
TCL
Communication Ltd.
Rev.
VFD 900 Level 2 Repair Document
Page
1.3
49/74
All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.
(5)
Place the battery deco foam A and battery deco foam C on the JIG, then fix them on the
positioning column.
(6)
Place the battery cover on the JIG and press it for a few seconds
Positioning column