4 Installation, Initial Operation
Specification:
FP130/150/FP150 Dental
FP210-215, FPV200-202
1.5 - 2 bar
3 - 4 bar
Dry and oil-free compressed air, external supply with an approved compressed air hose. The airflow (l/min) of
the compressor must enable the compressed air tank to fill in approx. 3 sec.
•
Connect the device to the mains supply (the mains line must always be accessible).
•
Use the “On/Off” switch to switch the device on or off.
The diagram is an example showing how an LN230 extraction and filter system is connected to a table laser.
Connecting the collection elements
In most cases, the collection elements or suction arms are supplied in a dismantled state with the system for transport
purposes. First check whether all parts have been included in the delivery and have not been damaged during transit.
Suction arm mounted on extraction and filter system
•
If it has not already been pre-installed at the factory, the mounting flange and the bracket must firstly be
mounted on the system. To do this, remove the system cover from the extraction system (to avoid damaging the
filter during mounting). Be aware that when mounting on a FP150 system, shavings may fall into the electronics.
If in doubt, contact your regional representative office.
•
The suction arm can now be attached to the mounting flange.
•
Make sure that the system as well as the mounted suction arm (due to the lever) are stable; additional
fixing/locking devices may be necessary (floor anchors, or similar).
•
Be aware that if the extraction level through the suction arm is too high, there may be a whistling sound at the
suction tip. If this is the case, turn down the extraction level slightly on the system.
61-236
Содержание LN Series
Страница 2: ...Sprachen Languages Deutsch 3 English 50 Fran aise 97 Espanol 143 Italiano 189 2 236...
Страница 48: ...9 Schaltplan 48 236...
Страница 49: ...10 Konformit tserkl rung Declaration of conformity 49 236...
Страница 95: ...9 Circuit diagram 95 236...
Страница 96: ...10 Konformit tserkl rung Declaration of conformity 96 236...
Страница 141: ...9 Plan de c blage 141 236...
Страница 142: ...10 Konformit tserkl rung Declaration of conformity 142 236...
Страница 187: ...9 Esquema de conexiones 187 236...
Страница 188: ...10 Konformit tserkl rung Declaration of conformity 188 236...
Страница 221: ...7 Ricerca e eliminazione delle anomalie max 4 bar 221 236...
Страница 234: ...9 Schema elettrico 234 236...
Страница 235: ...10 Konformit tserkl rung Declaration of conformity 235 236...