39
walls or walls with similar poor sound insulation, so as to avoid the
noise generated by the inverters when they work disturbing the
residents in the living areas.
安装步骤:
Installation Step:
步骤
1
:确认下墙面的承重要求
,
取出安装板并将其水平放置于墙面上,
高度保证逆变器的显示面板位置与眼平齐。
Step 1: Confirm the bearing requirement of the wall, Take out the
mounting plate and place it on the wall horizontally, and its
height shall ensure that the display panel position of the inverter
is aligned with the hole.
步骤
2
:根据安装支架的开孔,标注钻孔位置如图
4-9
所示,并使用冲
击钻在标注的钻孔位置钻孔,墙面推荐钻孔直径
10.0mm
,深
度
80mm
。
Step 2: According to the trepanning of the mounting bracket, mark the
position of drilling hole as shown in drawing 4-9, and use a
percussion drill to drill holes in the marked position. The
recommended drill holes on the wall is 10.0mm in diameter and
80mm in depth.