Kinergier pro bi-directional inverter User Manual
TBB Power Co., Ltd
10
4.
4.
Pre-installation
Pre-installation
Configuration
Configuration
4.1
4.1
Unpacking
Unpacking
and
and
inspection
inspection
4.1.1
4.1.1
Inspection
Inspection
of
of
appearance
appearance
Please confirm whether the equipment is damaged during transportation and whether the
accessories are complete after unpacking.
4.1.2
4.1.2
Packing
Packing
list
list
No.
Category
Quantity
Remark
1.
Bi-directional inverter
1
2.
BTS - battery temperature sensor
1
3.
Wall mount
1
4.
Expansion screw
4
5.
Hex Screw,M6*40mm
4
6.
User ,manual
1
7.
8P8C communication cable, 2m
1
8.
4P4C communication cable, 2m
1
The equipment should be transported to the installation site and then the outer packaging
should be removed. Check the various equipments and materials are correct according to the
packing list in this manual, and properly keep all kinds of spare parts and accessories for later
installation and upgrade equipment or maintenance.
4.2
4.2
Wiring
Wiring
recommendation
recommendation
Please find the following minimum wire size. In case of DC cable longer than 1m, please
increase the cross section of cable to reduce the loss.
System capacity
AC wiring
PE wiring
DC wiring
CK 4.0S
4mm²~10mm²
4mm²~10mm²
35mm²~90mm²
φ
8 aperture copper
terminal
Length<2m
CK 6.0S
6mm²~10mm²
6mm²~10mm²
CK 8.0S
8mm²~10mm²
8mm²~10mm²