C712 Operator Training
-26-
Parts
Three Months Parts Replacement
Every 3 months replace the following parts:
Design Caps
Mix Feed Tube O-Ring
Draw Valve O-Ring
Prime Plug O-Ring
Draw Valve H-Ring (Center)
Pump Drive Shaft O-Ring
(Small)
Beater Drive Shaft Seal
Pump Drive Shaft O-Ring
(Large)
Freezer Door Gasket
Pump O-Ring
Front Bearing
Pump Valve Gasket
Front Beater Shoes
Scraper Blades
Mix Feed Tube Check Ring
Most of the listed parts are available in the tune-up kit.
Refer to the Taylor Operator Manual or local Taylor Distributor for part numbers.
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
Содержание C712
Страница 1: ...Model C712...
Страница 2: ......